21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

HCM Signalized Intersection Capacity <strong>Analysis</strong><br />

10: SR-902 & Craig 2/8/2011<br />

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR<br />

Lane Configurations<br />

Volume (vph) 83 284 9 14 284 130 5 140 5 155 176 200<br />

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1000 1900 1900 1900 1900<br />

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0<br />

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00<br />

Frt 1.00 1.00 1.00 0.95 1.00 0.99 1.00 0.92<br />

Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00<br />

Satd. Flow (prot) 1787 1873 1805 1811 1770 975 1787 1731<br />

Flt Permitted 0.22 1.00 0.51 1.00 0.35 1.00 0.57 1.00<br />

Satd. Flow (perm) 423 1873 973 1811 649 975 1081 1731<br />

Peak-hour factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90<br />

Adj. Flow (vph) 92 316 10 16 316 144 6 156 6 172 196 222<br />

RTOR Reduction (vph) 0 2 0 0 26 0 0 2 0 0 67 0<br />

Lane Group Flow (vph) 92 324 0 16 434 0 6 160 0 172 351 0<br />

Heavy Vehicles (%) 1% 1% 1% 0% 0% 0% 2% 2% 2% 1% 1% 1%<br />

Turn Type pm+pt pm+pt pm+pt pm+pt<br />

Protected Phases 7 4 3 8 5 2 1 6<br />

Permitted Phases 4 8 2 6<br />

Actuated Green, G (s) 23.2 20.3 18.8 18.1 16.6 15.9 21.0 18.1<br />

Effective Green, g (s) 23.2 20.3 18.8 18.1 16.6 15.9 21.0 18.1<br />

Actuated g/C Ratio 0.42 0.36 0.34 0.32 0.30 0.28 0.38 0.32<br />

Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0<br />

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0<br />

Lane Grp Cap (vph) 247 681 338 587 207 278 444 561<br />

v/s Ratio Prot c0.02 0.17 0.00 c0.24 0.00 0.16 c0.02 c0.20<br />

v/s Ratio Perm 0.14 0.02 0.01 0.13<br />

v/c Ratio 0.37 0.48 0.05 0.74 0.03 0.58 0.39 0.63<br />

Uniform Delay, d1 11.3 13.7 12.4 16.8 14.1 17.1 12.4 16.0<br />

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00<br />

Incremental Delay, d2 0.9 0.5 0.1 4.9 0.1 2.9 0.6 2.2<br />

Delay (s) 12.2 14.2 12.5 21.6 14.1 19.9 13.0 18.2<br />

Level of Service B B B C B B B B<br />

Approach Delay (s) 13.8 21.3 19.7 16.7<br />

Approach LOS B C B B<br />

Intersection Summary<br />

HCM Average Control Delay 17.6 HCM Level of Service B<br />

HCM Volume to Capacity ratio 0.75<br />

Actuated Cycle Length (s) 55.8 Sum of lost time (s) 20.0<br />

Intersection Capacity Utilization 65.6% ICU Level of Service C<br />

<strong>Analysis</strong> Period (min) 15<br />

Description: Signalized, Optimized<br />

c Critical Lane Group<br />

2019 plus Project, Alt. 1, PH3-Mitigation Synchro 7 - Report<br />

cak Page 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!