21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

6.1.7 ALTERNATIVE 3 – 2012 Buildout<br />

The traffic volumes included for this analysis include 2012 background traffic volumes plus project<br />

Buildout related traffic. The volumes used for this analysis scenario are shown on Figure 19. A<br />

summary of the LOS results are shown below in Table 19.<br />

Table 19. Level of Service for 2012 with Project PM Peak Hour Conditions-Alternative 3<br />

INTERSECTION<br />

(S) Signalized<br />

(U) Unsignalized<br />

(R) Roundabout<br />

Critical<br />

Movement By<br />

Approach<br />

Peak hour Level of Service (LOS)<br />

PM Peak Hour<br />

Delay<br />

Hwy. 2 / Craig Rd. U NB LTR * F<br />

Hwy. 2 / Lundstrom St. U NB LTR 42.0 E<br />

Hwy. 2 / Lawson St. S -- 18.2 B<br />

Hwy. 2 / Garfield St. S -- 18.8 B<br />

Hwy. 2 / Hayford Rd. S -- 56.0 E<br />

Craig Rd. / Deno Rd. U WB LTR 10.4 B<br />

Craig Rd. / McFarlane St. U WB LTR 14.7 B<br />

Craig Rd. / Thorpe Rd. East U SB LR 10.8 B<br />

Craig Rd. / Thorpe Rd. West U NB LR 9.8 A<br />

Craig Rd. / SR 902 U SB LTR 319.6 F<br />

Hwy. 2 / Fairchild AFB S -- 18.5 B<br />

Craig Rd. / 6 th Ave. U WB Lt 11.5 B<br />

Hwy 2 / Driveway West U SB Rt 15.9 C<br />

Hwy 2 / Driveway Middle U SB Lt * F<br />

Hwy 2 / Driveway East U SB Rt 15.6 C<br />

Craig Rd. / Driveway North U EB Lt 12.3 B<br />

Craig Rd. / Driveway Middle U EB Lt 11.2 B<br />

Craig Rd. / Driveway South U EB Lt 12.8 B<br />

* Excessive Delay<br />

The Hwy 2 / Craig Rd., Craig Rd. / SR 902 and Hwy 2 / Middle Driveway intersections are anticipated to<br />

experience a failing LOS. Mitigations for these locations are identified in the mitigation subsection at<br />

the end of the Alternative 3 section.<br />

LOS<br />

West Plains Development – Spokane Tribe Page | 71<br />

<strong>Traffic</strong> <strong>Impact</strong> <strong>Analysis</strong> April 28, 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!