MITIGATION-ALT 2, CONTINUED<br />

2012 PM Peak<br />

BG + Alt2-<br />

INTERSECTION<br />

Buildout<br />

2032 PM Peak<br />

BG + Alt2-<br />

Buildout<br />

Hwy. 2 /<br />

--<br />

LOS = E<br />

Fairchild AFB Delay = 75.8<br />

Optimized Signal Timing, Add NB Lt turn<br />

bay and WB through lane<br />

Craig Rd. /<br />

6th Ave.<br />

Add NB Right turn bay --<br />

--<br />

--<br />

LOS = D<br />

Delay = 50.6<br />

CM = WB Lt<br />

LOS = E<br />

Delay = 42.6<br />

CM = WB Lt<br />

LOS = D<br />

Delay = 28.5<br />

Hwy. 2 / CM = SBL CM = SBL<br />

Dwy. Middle LOS = F LOS = F<br />

Signalized<br />

Roundabout<br />

Delay = * Delay = *<br />

LOS = C<br />

LOS = D<br />

Delay = 31.1 Delay = 46.8<br />

LOS = A<br />

LOS = E<br />

Delay = 9.8 Delay = 65.8<br />

Listed below are improvements re<strong>com</strong>mended for consideration to reduce traffic impacts associated with<br />

the subject project. The project’s re<strong>com</strong>mended proportional share contribution to each mitigation is also<br />

listed. The proportional share for off-site intersections is calculated by divided the project generated<br />

traffic volume by the total intersection volume for each respective scenario.<br />

2012 (Alt. 2 Buildout) Mitigations:<br />

<br />

<br />

<br />

Hwy 2 / Craig: Install traffic signal and widen the NB and SB approaches to provide and<br />

exclusive left turn lane. Alternatively, consider installation of a roundabout.<br />

Project Proportional Share: 34.2%<br />

Resulting LOS & Delay (sec): C/31.6 / A/7.8<br />

Hwy 2 / Hayford: Optimize signal timing and convert the inside SB thru lane to a 2 nd SB left<br />

turn lane.<br />

Project Proportional Share: 15.8%<br />

Resulting LOS & Delay (sec): D/45.9<br />

Craig / SR 902: Install traffic signal or consider installation of a roundabout.<br />

Project Proportional Share: 23.7%<br />

Resulting LOS & Delay (sec): B/15.6 / A/8.6 (roundabout)<br />

Hwy 2 / Middle Driveway: Install traffic signal and approach improvements (SB Middle<br />

Driveway); install a WB right turn lane. Alternatively, consider installation of a roundabout.<br />

Project Proportional Share: 100%<br />

Resulting LOS & Delay (sec): C/31.1 / A/9.8 (roundabout)<br />

West Plains Development – Spokane Tribe Page | 70<br />

<strong>Traffic</strong> <strong>Impact</strong> <strong>Analysis</strong> April 28, 2011