21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

HCM Signalized Intersection Capacity <strong>Analysis</strong><br />

14: Hwy. 2 & Middle Access 2/14/2011<br />

Movement EBL EBT WBT WBR SBL SBR<br />

Lane Configurations<br />

Volume (vph) 341 1829 1603 449 698 144<br />

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900<br />

Total Lost time (s) 5.0 5.0 4.0 4.0 4.0 4.0<br />

Lane Util. Factor 1.00 0.95 0.95 1.00 0.97 1.00<br />

Frt 1.00 1.00 1.00 0.85 1.00 0.85<br />

Flt Protected 0.95 1.00 1.00 1.00 0.95 1.00<br />

Satd. Flow (prot) 1770 3539 3539 1583 3433 1583<br />

Flt Permitted 0.95 1.00 1.00 1.00 0.95 1.00<br />

Satd. Flow (perm) 1770 3539 3539 1583 3433 1583<br />

Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92<br />

Adj. Flow (vph) 371 1988 1742 488 759 157<br />

RTOR Reduction (vph) 0 0 0 252 0 124<br />

Lane Group Flow (vph) 371 1988 1742 236 759 33<br />

Turn Type Prot Perm Perm<br />

Protected Phases 5 2 6 4<br />

Permitted Phases 6 4<br />

Actuated Green, G (s) 24.0 86.0 58.0 58.0 25.0 25.0<br />

Effective Green, g (s) 24.0 86.0 58.0 58.0 25.0 25.0<br />

Actuated g/C Ratio 0.20 0.72 0.48 0.48 0.21 0.21<br />

Clearance Time (s) 5.0 5.0 4.0 4.0 4.0 4.0<br />

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0<br />

Lane Grp Cap (vph) 354 2536 1711 765 715 330<br />

v/s Ratio Prot c0.21 0.56 c0.49 c0.22<br />

v/s Ratio Perm 0.15 0.02<br />

v/c Ratio 1.05 0.78 1.02 0.31 1.06 0.10<br />

Uniform Delay, d1 48.0 11.0 31.0 18.8 47.5 38.4<br />

Progression Factor 1.00 1.00 1.00 1.00 0.99 0.98<br />

Incremental Delay, d2 61.0 2.5 26.4 1.0 51.2 0.6<br />

Delay (s) 109.0 13.5 57.4 19.9 98.2 38.3<br />

Level of Service F B E B F D<br />

Approach Delay (s) 28.5 49.2 88.0<br />

Approach LOS C D F<br />

Intersection Summary<br />

HCM Average Control Delay 46.8 HCM Level of Service D<br />

HCM Volume to Capacity ratio 1.04<br />

Actuated Cycle Length (s) 120.0 Sum of lost time (s) 13.0<br />

Intersection Capacity Utilization 93.9% ICU Level of Service F<br />

<strong>Analysis</strong> Period (min) 15<br />

Description: Signalized, Optimized<br />

c Critical Lane Group<br />

West Plains Development <strong>Traffic</strong> <strong>Impact</strong> <strong>Analysis</strong><br />

Synchro 7 - Report<br />

2032-Alternative 2 Buildout-Mitigated Page 9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!