21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MOVEMENT SUMMARY<br />

West RB<br />

2032 Alt.1<br />

Roundabout<br />

Site: Access W-2032 Alt.1<br />

Movement Performance - Vehicles<br />

Mov IDTurn<br />

Demand<br />

Deg. Average Level of 95% Back of Queue Prop. Effective Average<br />

Flow HV Satn Delay Service Vehicles Distance Queued Stop Rate Speed<br />

veh/h % v/c sec veh ft per veh mph<br />

South: 21 st<br />

3L L 11 1.0 0.803 69.6 LOS E 5.6 139.9 0.98 1.23 13.9<br />

8T T 368 1.0 0.803 61.0 LOS E 7.3 183.9 0.99 1.26 12.7<br />

8R R 11 1.0 0.039 14.1 LOS B 0.2 6.2 0.98 0.87 23.9<br />

Approach 389 1.0 0.803 60.0 LOS E 7.3 183.9 0.99 1.25 12.9<br />

East: US 2<br />

1L L 11 1.0 1.077 71.6 LOS E 42.2 1063.8 1.00 2.29 12.2<br />

6T T 2219 1.0 1.077 70.4 LOS E 45.3 1142.3 1.00 2.31 13.8<br />

6R R 265 1.0 0.165 0.0 X X X X 0.35 32.0<br />

Approach 2495 1.0 1.077 62.9 LOS E 45.3 1142.3 0.89 2.10 14.5<br />

North: Access PL (West)<br />

7L L 137 1.0 0.328 14.4 LOS B 2.1 53.5 0.97 1.00 20.8<br />

4T T 474 1.0 1.039 83.1 LOS F 21.5 542.5 1.00 1.99 10.3<br />

4R R 243 1.0 0.532 19.1 LOS B 4.2 106.2 1.00 1.09 22.5<br />

Approach 854 1.0 1.039 53.9 LOS D 21.5 542.5 1.00 1.57 13.9<br />

West: US 2<br />

5L L 139 1.0 0.159 5.7 LOS A 0.7 17.5 0.54 0.80 30.0<br />

2T T 2222 1.0 0.991 43.9 LOS D25.8 650.0 1.00 1.37 17.5<br />

2R R 11 1.0 0.008 2.9 LOS A 0.0 1.1 0.49 0.55 36.7<br />

Approach 2372 1.0 0.991 41.5 LOS D 25.8 650.0 0.97 1.34 18.0<br />

All Vehicles 6109 1.0 1.077 53.2 LOS D45.3 1142.3 0.94 1.68 15.4<br />

X: Not applicable for Continuous movement.<br />

Level of Service (LOS) Method: Delay (HCM 2000).<br />

Roundabout LOS Method: Same as Signalised Intersections.<br />

Vehicle movement LOS values are based on average delay per movement<br />

Intersection and Approach LOS values are based on average delay for all vehicle movements.<br />

Roundabout Capacity Model: SIDRA Standard.<br />

HCM Delay Model used.<br />

Processed: Wednesday, July 13, 2011 10:31:06 AM Copyright © 2000-2011 Akcelik and Associates Pty Ltd<br />

SIDRA INTERSECTION 5.1.3.1990<br />

www.sidrasolutions.<strong>com</strong><br />

Project: P:\S\SPTR00000001\0600INFO\<strong>Traffic</strong>\April 2011-Final TIA\Sidra\7-12-11\Hwy.2-West Roundabout<br />

\US2_Access_3Rbs.sip<br />

8000011, DAVID EVANS & ASSOCIATES INC, SINGLE

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!