21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

HCM Unsignalized Intersection Capacity <strong>Analysis</strong><br />

12: 6th Ave & Craig Road 2/8/2011<br />

Movement WBL WBR NBT NBR SBL SBT<br />

Lane Configurations<br />

Volume (veh/h) 132 0 230 149 0 191<br />

Sign Control Stop Free Free<br />

Grade 0% 0% 0%<br />

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92<br />

Hourly flow rate (vph) 143 0 250 162 0 208<br />

Pedestrians<br />

Lane Width (ft)<br />

Walking Speed (ft/s)<br />

Percent Blockage<br />

Right turn flare (veh) 4<br />

Median type TWLTL None<br />

Median storage veh) 2<br />

Upstream signal (ft)<br />

pX, platoon unblocked<br />

vC, conflicting volume 539 331 412<br />

vC1, stage 1 conf vol 331<br />

vC2, stage 2 conf vol 208<br />

vCu, unblocked vol 539 331 412<br />

tC, single (s) 6.4 6.2 4.1<br />

tC, 2 stage (s) 5.4<br />

tF (s) 3.5 3.3 2.2<br />

p0 queue free % 78 100 100<br />

cM capacity (veh/h) 662 711 1147<br />

Direction, Lane # WB 1 NB 1 SB 1 SB 2<br />

Volume Total 143 412 0 208<br />

Volume Left 143 0 0 0<br />

Volume Right 0 162 0 0<br />

cSH 655 1700 1700 1700<br />

Volume to Capacity 0.22 0.24 0.00 0.12<br />

Queue Length 95th (ft) 21 0 0 0<br />

Control Delay (s) 12.0 0.0 0.0 0.0<br />

Lane LOS<br />

B<br />

Approach Delay (s) 12.0 0.0 0.0<br />

Approach LOS<br />

B<br />

Intersection Summary<br />

Average Delay 2.3<br />

Intersection Capacity Utilization 35.2% ICU Level of Service A<br />

<strong>Analysis</strong> Period (min) 15<br />

2012 plus Project, Alt. 2, Buildout Synchro 7 - Report<br />

cak Page 12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!