21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

HCM Signalized Intersection Capacity <strong>Analysis</strong><br />

14: Hwy. 2 & Middle Access 2/8/2011<br />

Movement EBL EBT WBT WBR SBL SBR<br />

Lane Configurations<br />

Volume (vph) 366 1234 1114 539 804 174<br />

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900<br />

Total Lost time (s) 5.0 5.0 4.0 4.0 4.0 4.0<br />

Lane Util. Factor 1.00 0.95 0.95 1.00 0.97 1.00<br />

Frt 1.00 1.00 1.00 0.85 1.00 0.85<br />

Flt Protected 0.95 1.00 1.00 1.00 0.95 1.00<br />

Satd. Flow (prot) 1770 3539 3539 1583 3433 1583<br />

Flt Permitted 0.95 1.00 1.00 1.00 0.95 1.00<br />

Satd. Flow (perm) 1770 3539 3539 1583 3433 1583<br />

Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92<br />

Adj. Flow (vph) 398 1341 1211 586 874 189<br />

RTOR Reduction (vph) 0 0 0 354 0 138<br />

Lane Group Flow (vph) 398 1341 1211 232 874 51<br />

Turn Type Prot Perm Perm<br />

Protected Phases 5 2 6 4<br />

Permitted Phases 6 4<br />

Actuated Green, G (s) 28.4 80.0 47.6 47.6 31.0 31.0<br />

Effective Green, g (s) 28.4 80.0 47.6 47.6 31.0 31.0<br />

Actuated g/C Ratio 0.24 0.67 0.40 0.40 0.26 0.26<br />

Clearance Time (s) 5.0 5.0 4.0 4.0 4.0 4.0<br />

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0<br />

Lane Grp Cap (vph) 419 2359 1404 628 887 409<br />

v/s Ratio Prot c0.22 0.38 c0.34 c0.25<br />

v/s Ratio Perm 0.15 0.03<br />

v/c Ratio 0.95 0.57 0.86 0.37 0.99 0.12<br />

Uniform Delay, d1 45.1 10.7 33.2 25.6 44.3 34.1<br />

Progression Factor 1.00 1.00 1.00 1.00 0.98 0.94<br />

Incremental Delay, d2 31.0 1.0 7.2 1.7 26.9 0.6<br />

Delay (s) 76.1 11.7 40.4 27.3 70.3 32.8<br />

Level of Service E B D C E C<br />

Approach Delay (s) 26.5 36.1 63.7<br />

Approach LOS C D E<br />

Intersection Summary<br />

HCM Average Control Delay 38.8 HCM Level of Service D<br />

HCM Volume to Capacity ratio 0.92<br />

Actuated Cycle Length (s) 120.0 Sum of lost time (s) 13.0<br />

Intersection Capacity Utilization 84.8% ICU Level of Service E<br />

<strong>Analysis</strong> Period (min) 15<br />

Description: Signalized, Optimized<br />

c Critical Lane Group<br />

2015 plus Project, Alt. 1, PH2-Mitigation Synchro 7 - Report<br />

cak Page 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!