21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

INTERSECTION SUMMARY<br />

Craig Rd./Hwy. 902 (YEAR 2019 PM PEAK, ALT.1,PH.3)<br />

West Plains Development<br />

Roundabout<br />

Site: Roundabout<br />

Intersection Performance - Hourly Values<br />

Performance Measure Vehicles Persons<br />

Demand Flows (Total) 1650 veh/h 1990 pers/h<br />

Percent Heavy Vehicles 1.1 %<br />

Degree of Saturation 0.749<br />

Practical Spare Capacity 13.4 %<br />

Effective Intersection Capacity<br />

2202 veh/h<br />

Control Delay (Total) 4.76 veh-h/h 5.72 pers-h/h<br />

Control Delay (Average) 10.4 sec 10.3 sec<br />

Control Delay (Worst Lane)<br />

13.9 sec<br />

Control Delay (Worst Movement) 17.9 sec 17.9 sec<br />

Geometric Delay (Average)<br />

5.0 sec<br />

Stop-Line Delay (Average)<br />

5.4 sec<br />

Level of Service (Aver. Int. Delay)<br />

LOS B<br />

Level of Service (Worst Movement)<br />

LOS B<br />

Level of Service (Worst Lane)<br />

LOS B<br />

95% Back of Queue - Vehicles (Worst Lane) 10.5 veh<br />

95% Back of Queue - Distance (Worst Lane) 264.4 ft<br />

Total Effective Stops 1379 veh/h 1654 pers/h<br />

Effective Stop Rate 0.84 per veh 0.83 per pers<br />

Proportion Queued 0.76 0.75<br />

Performance Index 37.0 37.0<br />

Travel Distance (Total) 606.8 veh-mi/h 728.2 pers-mi/h<br />

Travel Distance (Average) 1942 ft 1932 ft<br />

Travel Time (Total) 21.8 veh-h/h 26.2 pers-h/h<br />

Travel Time (Average) 47.6 sec 47.3 sec<br />

Travel Speed 27.8 mph 27.8 mph<br />

Cost (Total) 359.58 $/h 359.58 $/h<br />

Fuel Consumption (Total)<br />

28.2 gal/h<br />

Carbon Dioxide (Total)<br />

266.9 kg/h<br />

Hydrocarbons (Total)<br />

0.442 kg/h<br />

Carbon Monoxide (Total)<br />

19.92 kg/h<br />

NOx (Total)<br />

0.615 kg/h<br />

LOS (Aver. Int. Delay) for Vehicles is based on average delay for all vehicle movements. LOS Method: Delay (HCM).<br />

LOS Method for individual vehicle movements and lanes: Delay (HCM).<br />

Roundabout LOS Method: Same as Signalised Intersections.<br />

Roundabout Capacity Model: SIDRA Standard.<br />

Intersection Performance - Annual Values<br />

Performance Measure Vehicles Persons<br />

Demand Flows (Total) 792,000 veh/y 955,200 pers/y<br />

Delay 2,286 veh-h/y 2,744 pers-h/y<br />

Effective Stops 661,775 veh/y 794,130 pers/y<br />

Travel Distance 291,267 veh-mi/y 349,521 pers-mi/y<br />

Travel Time 10,467 veh-h/y 12,560 pers-h/y<br />

Cost 172,599 $/y 172,599 $/y<br />

Fuel Consumption<br />

13,534 gal/y<br />

Carbon Dioxide<br />

128,136 kg/y<br />

Hydrocarbons<br />

212 kg/y<br />

Carbon Monoxide<br />

9,564 kg/y<br />

NOx<br />

295 kg/y<br />

Processed: Tuesday, February 08, 2011 2:28:08 PM Copyright © 2000-2010 Akcelik & Associates Pty Ltd<br />

SIDRA INTERSECTION 5.0.5.1510<br />

www.sidrasolutions.<strong>com</strong><br />

Project: P:\S\SPTR00000001\0600INFO\<strong>Traffic</strong>\February-2011-TIA\Sidra\SR902-Craig Rd\Alt1-PH3-SR902.sip

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!