21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

INTERSECTION SUMMARY<br />

Craig Rd./Hwy. 902 (YEAR 2032 PM PEAK, Alt 3 Buildout)<br />

West Plains Development<br />

Roundabout<br />

Site: Roundabout<br />

Intersection Performance - Hourly Values<br />

Performance Measure Vehicles Persons<br />

Demand Flows (Total) 1636 veh/h 1973 pers/h<br />

Percent Heavy Vehicles 1.1 %<br />

Degree of Saturation 0.747<br />

Practical Spare Capacity 13.7 %<br />

Effective Intersection Capacity<br />

2188 veh/h<br />

Control Delay (Total) 4.58 veh-h/h 5.50 pers-h/h<br />

Control Delay (Average) 10.1 sec 10.0 sec<br />

Control Delay (Worst Lane)<br />

15.2 sec<br />

Control Delay (Worst Movement) 19.5 sec 19.5 sec<br />

Geometric Delay (Average)<br />

4.7 sec<br />

Stop-Line Delay (Average)<br />

5.4 sec<br />

Level of Service (Aver. Int. Delay)<br />

LOS B<br />

Level of Service (Worst Movement)<br />

LOS B<br />

Level of Service (Worst Lane)<br />

LOS B<br />

95% Back of Queue - Vehicles (Worst Lane) 10.1 veh<br />

95% Back of Queue - Distance (Worst Lane) 254.8 ft<br />

Total Effective Stops 1326 veh/h 1591 pers/h<br />

Effective Stop Rate 0.81 per veh 0.81 per pers<br />

Proportion Queued 0.73 0.73<br />

Performance Index 36.2 36.2<br />

Travel Distance (Total) 596.8 veh-mi/h 716.1 pers-mi/h<br />

Travel Distance (Average) 1927 ft 1917 ft<br />

Travel Time (Total) 21.5 veh-h/h 25.8 pers-h/h<br />

Travel Time (Average) 47.3 sec 47.1 sec<br />

Travel Speed 27.8 mph 27.8 mph<br />

Cost (Total) 351.60 $/h 351.60 $/h<br />

Fuel Consumption (Total)<br />

27.3 gal/h<br />

Carbon Dioxide (Total)<br />

258.4 kg/h<br />

Hydrocarbons (Total)<br />

0.427 kg/h<br />

Carbon Monoxide (Total)<br />

18.93 kg/h<br />

NOx (Total)<br />

0.588 kg/h<br />

LOS (Aver. Int. Delay) for Vehicles is based on average delay for all vehicle movements. LOS Method: Delay (HCM).<br />

LOS Method for individual vehicle movements and lanes: Delay (HCM).<br />

Roundabout LOS Method: Same as Signalised Intersections.<br />

Roundabout Capacity Model: SIDRA Standard.<br />

Intersection Performance - Annual Values<br />

Performance Measure Vehicles Persons<br />

Demand Flows (Total) 785,067 veh/y 946,880 pers/y<br />

Delay 2,199 veh-h/y 2,639 pers-h/y<br />

Effective Stops 636,437 veh/y 763,724 pers/y<br />

Travel Distance 286,449 veh-mi/y 343,739 pers-mi/y<br />

Travel Time 10,319 veh-h/y 12,382 pers-h/y<br />

Cost 168,770 $/y 168,770 $/y<br />

Fuel Consumption<br />

13,102 gal/y<br />

Carbon Dioxide<br />

124,043 kg/y<br />

Hydrocarbons<br />

205 kg/y<br />

Carbon Monoxide<br />

9,084 kg/y<br />

NOx<br />

282 kg/y<br />

Processed: Thursday, February 10, 2011 11:44:04 AM Copyright © 2000-2010 Akcelik & Associates Pty Ltd<br />

SIDRA INTERSECTION 5.0.5.1510<br />

www.sidrasolutions.<strong>com</strong><br />

Project: P:\S\SPTR00000001\0600INFO\<strong>Traffic</strong>\February-2011-TIA\Sidra\SR902-Craig Rd\2032 Alt3-Buildout-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!