Hwy 2 / Fairchild AFB: Modify signal timing. Add a 2 nd NB right turn lane.<br />

Project Proportional Share: 11.6%<br />

Resulting LOS & Delay (sec): D/51.6<br />

Craig Rd./Sixth Ave.: Consider installation of a roundabout in lieu of mitigation identified for<br />

2019 condition.<br />

Project Proportional Share: 33.5%<br />

Resulting LOS & Delay (sec): C/20.5<br />

Craig / North Driveway.: Consider adding a 2 nd NB thru lane. If this improvement is chosen it<br />

is re<strong>com</strong>mended that the 2 nd NB thru lane be continuous from Highway 2 to 6 th Ave.<br />

Alternatively, consider installation of a roundabout which would also achieve a satisfactory level<br />

of service.<br />

Project Proportional Share: 100%<br />

Resulting LOS & Delay (sec): E.37.3 / B/11.4 (roundabout)<br />

HWY 2/West Site Access: Add a 4 th , southerly leg to the intersection to extend and connect to<br />

21 St Ave.<br />

Resulting LOS & Delay (sec): D/53.2<br />

HWY 2/Craig Rd.: Modify northbound and southbound approaches to provide dual left turn<br />

capability.<br />

Resulting LOS & Delay (sec): D/54.4<br />

2032 Alternative 2 Mitigations (in addition to Alt. 2 2012 mitigations above):<br />

In lieu of constructing the mitigations identified in the TIA at the Lundstrom, Lawson, Garfield<br />

intersections along HWY 2 is re<strong>com</strong>mend that the project contribute a proportional share to<br />

improvements to the 21 st Ave. alternative route which will relieve traffic from the HWY 2 corridor<br />

and likely eliminate the need for improvements to the Lundstrom, Lawson and Garfield intersections.<br />

Craig / Sixth Ave.: Widen the intersection approach to provide and exclusive NB right turn lane.<br />

Project Proportional Share: 25.6%<br />

Hwy 2 / Fairchild AFB: Modify signal timing. Add a 2 nd NB right turn lane.<br />

Project Proportional Share: 11.6%<br />

Resulting LOS & Delay (sec): D/44.8<br />

HWY 2/West Site Access: Add a 4 th , southerly leg to the intersection to extend and connect to<br />

21 St Ave.<br />

Resulting LOS & Delay (sec): D/37.9<br />

2032 Alternative 3 Mitigations (in addition to Alt. 3 mitigations above):<br />

In lieu of constructing the mitigations identified in the TIA at the Lundstrom, Lawson, Garfield<br />

intersections along HWY 2 is re<strong>com</strong>mend that the project contribute a proportional share to<br />

improvements to the 21 st Ave. alternative route which will relieve traffic from the HWY 2 corridor<br />

and likely eliminate the need for improvements to the Lundstrom, Lawson and Garfield intersections.<br />

Hwy 2 / Fairchild AFB: Modify signal timing. Add a 2 nd NB right turn lane.<br />

Project Proportional Share: 11.6%<br />

Resulting LOS & Delay (sec): D/42.7<br />

HWY 2/West Site Access: Add a 4 th , southerly leg to the intersection to extend and connect to<br />

21 St Ave.<br />

Resulting LOS & Delay (sec): D/33.9<br />

West Plains Development – Spokane Tribe Page | 8<br />

<strong>Traffic</strong> <strong>Impact</strong> <strong>Analysis</strong> Addendum July 18, 2011