21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

INTERSECTION SUMMARY<br />

Craig Rd./Hwy. (YEAR 2015 PM PEAK, ALT.1,PH.2)<br />

West Plains Development<br />

Roundabout<br />

Site: Roundabout<br />

Intersection Performance - Hourly Values<br />

Performance Measure Vehicles Persons<br />

Demand Flows (Total) 4990 veh/h 5998 pers/h<br />

Percent Heavy Vehicles 1.0 %<br />

Degree of Saturation 0.851<br />

Practical Spare Capacity -0.1 %<br />

Effective Intersection Capacity<br />

5864 veh/h<br />

Control Delay (Total) 17.20 veh-h/h 20.64 pers-h/h<br />

Control Delay (Average) 12.4 sec 12.4 sec<br />

Control Delay (Worst Lane)<br />

37.9 sec<br />

Control Delay (Worst Movement) 37.9 sec 37.9 sec<br />

Geometric Delay (Average)<br />

4.5 sec<br />

Stop-Line Delay (Average)<br />

7.9 sec<br />

Level of Service (Aver. Int. Delay)<br />

LOS B<br />

Level of Service (Worst Movement)<br />

LOS D<br />

Level of Service (Worst Lane)<br />

LOS D<br />

95% Back of Queue - Vehicles (Worst Lane) 14.6 veh<br />

95% Back of Queue - Distance (Worst Lane) 368.1 ft<br />

Total Effective Stops 4800 veh/h 5760 pers/h<br />

Effective Stop Rate 0.96 per veh 0.96 per pers<br />

Proportion Queued 0.80 0.80<br />

Performance Index 120.4 120.4<br />

Travel Distance (Total) 1807.9 veh-mi/h 2169.5 pers-mi/h<br />

Travel Distance (Average) 1913 ft 1910 ft<br />

Travel Time (Total) 68.1 veh-h/h 81.7 pers-h/h<br />

Travel Time (Average) 49.1 sec 49.0 sec<br />

Travel Speed 26.6 mph 26.6 mph<br />

Cost (Total) 1097.97 $/h 1097.97 $/h<br />

Fuel Consumption (Total)<br />

83.8 gal/h<br />

Carbon Dioxide (Total)<br />

792.9 kg/h<br />

Hydrocarbons (Total)<br />

1.325 kg/h<br />

Carbon Monoxide (Total)<br />

58.21 kg/h<br />

NOx (Total)<br />

1.789 kg/h<br />

LOS (Aver. Int. Delay) for Vehicles is based on average delay for all vehicle movements. LOS Method: Delay (HCM).<br />

LOS Method for individual vehicle movements and lanes: Delay (HCM).<br />

Roundabout LOS Method: Same as Signalised Intersections.<br />

Roundabout Capacity Model: SIDRA Standard.<br />

Intersection Performance - Annual Values<br />

Performance Measure Vehicles Persons<br />

Demand Flows (Total) 2,395,355 veh/y 2,879,226 pers/y<br />

Delay 8,257 veh-h/y 9,909 pers-h/y<br />

Effective Stops 2,304,148 veh/y 2,764,978 pers/y<br />

Travel Distance 867,784 veh-mi/y 1,041,341 pers-mi/y<br />

Travel Time 32,665 veh-h/y 39,198 pers-h/y<br />

Cost 527,026 $/y 527,026 $/y<br />

Fuel Consumption<br />

40,203 gal/y<br />

Carbon Dioxide<br />

380,613 kg/y<br />

Hydrocarbons<br />

636 kg/y<br />

Carbon Monoxide<br />

27,942 kg/y<br />

NOx<br />

859 kg/y<br />

Processed: Tuesday, February 08, 2011 1:38:38 PM Copyright © 2000-2010 Akcelik & Associates Pty Ltd<br />

SIDRA INTERSECTION 5.0.5.1510<br />

www.sidrasolutions.<strong>com</strong><br />

Project: P:\S\SPTR00000001\0600INFO\<strong>Traffic</strong>\February-2011-TIA\Sidra\Craig-Hwy.2\Alt1-PH2-Craig.sip

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!