21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

INTERSECTION SUMMARY<br />

Middle Dwy./Hwy. (YEAR 2032 PM PEAK, Alt 2 Buildout)<br />

West Plains Development<br />

Roundabout<br />

Site: Roundabout<br />

Intersection Performance - Hourly Values<br />

Performance Measure Vehicles Persons<br />

Demand Flows (Total) 5504 veh/h 6615 pers/h<br />

Percent Heavy Vehicles 1.0 %<br />

Degree of Saturation 1.370<br />

Practical Spare Capacity -37.9 %<br />

Effective Intersection Capacity<br />

4019 veh/h<br />

Control Delay (Total) 100.57 veh-h/h 120.68 pers-h/h<br />

Control Delay (Average) 65.8 sec 65.7 sec<br />

Control Delay (Worst Lane)<br />

200.9 sec<br />

Control Delay (Worst Movement) 199.0 sec 199.0 sec<br />

Geometric Delay (Average)<br />

4.6 sec<br />

Stop-Line Delay (Average)<br />

61.2 sec<br />

Level of Service (Aver. Int. Delay)<br />

LOS E<br />

Level of Service (Worst Movement)<br />

LOS F<br />

Level of Service (Worst Lane)<br />

LOS F<br />

95% Back of Queue - Vehicles (Worst Lane) 59.7 veh<br />

95% Back of Queue - Distance (Worst Lane) 1503.6 ft<br />

Total Effective Stops 10973 veh/h 13168 pers/h<br />

Effective Stop Rate 1.99 per veh 1.99 per pers<br />

Proportion Queued 0.87 0.87<br />

Performance Index 318.7 318.7<br />

Travel Distance (Total) 1988.4 veh-mi/h 2386.1 pers-mi/h<br />

Travel Distance (Average) 1907 ft 1905 ft<br />

Travel Time (Total) 157.6 veh-h/h 189.2 pers-h/h<br />

Travel Time (Average) 103.1 sec 102.9 sec<br />

Travel Speed 12.6 mph 12.6 mph<br />

Cost (Total) 2200.90 $/h 2200.90 $/h<br />

Fuel Consumption (Total)<br />

130.3 gal/h<br />

Carbon Dioxide (Total)<br />

1233.4 kg/h<br />

Hydrocarbons (Total)<br />

2.301 kg/h<br />

Carbon Monoxide (Total)<br />

84.09 kg/h<br />

NOx (Total)<br />

2.416 kg/h<br />

LOS (Aver. Int. Delay) for Vehicles is based on average delay for all vehicle movements. LOS Method: Delay (HCM).<br />

LOS Method for individual vehicle movements and lanes: Delay (HCM).<br />

Roundabout LOS Method: Same as Signalised Intersections.<br />

Roundabout Capacity Model: SIDRA Standard.<br />

Intersection Performance - Annual Values<br />

Performance Measure Vehicles Persons<br />

Demand Flows (Total) 2,642,087 veh/y 3,175,305 pers/y<br />

Delay 48,273 veh-h/y 57,928 pers-h/y<br />

Effective Stops 5,267,057 veh/y 6,320,469 pers/y<br />

Travel Distance 954,453 veh-mi/y 1,145,343 pers-mi/y<br />

Travel Time 75,663 veh-h/y 90,795 pers-h/y<br />

Cost 1,056,434 $/y 1,056,434 $/y<br />

Fuel Consumption<br />

62,534 gal/y<br />

Carbon Dioxide<br />

592,022 kg/y<br />

Hydrocarbons<br />

1,104 kg/y<br />

Carbon Monoxide<br />

40,362 kg/y<br />

NOx<br />

1,159 kg/y<br />

Processed: Thursday, February 10, 2011 11:21:49 AM Copyright © 2000-2010 Akcelik & Associates Pty Ltd<br />

SIDRA INTERSECTION 5.0.5.1510<br />

www.sidrasolutions.<strong>com</strong><br />

Project: P:\S\SPTR00000001\0600INFO\<strong>Traffic</strong>\February-2011-TIA\Sidra\Hwy.2-Middle Dwy\2032 Alt2-Buildout-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!