21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

INTERSECTION SUMMARY<br />

Craig Rd./Hwy. (YEAR 2032 PM PEAK, ALT1 Buildout)<br />

West Plains Development<br />

Roundabout<br />

Site: Roundabout<br />

Intersection Performance - Hourly Values<br />

Performance Measure Vehicles Persons<br />

Demand Flows (Total) 7089 veh/h 8517 pers/h<br />

Percent Heavy Vehicles 1.0 %<br />

Degree of Saturation 1.354<br />

Practical Spare Capacity -37.2 %<br />

Effective Intersection Capacity<br />

5240 veh/h<br />

Control Delay (Total) 186.89 veh-h/h 224.27 pers-h/h<br />

Control Delay (Average) 94.9 sec 94.8 sec<br />

Control Delay (Worst Lane)<br />

229.1 sec<br />

Control Delay (Worst Movement) 229.1 sec 229.1 sec<br />

Geometric Delay (Average)<br />

4.7 sec<br />

Stop-Line Delay (Average)<br />

90.2 sec<br />

Level of Service (Aver. Int. Delay)<br />

LOS F<br />

Level of Service (Worst Movement)<br />

LOS F<br />

Level of Service (Worst Lane)<br />

LOS F<br />

95% Back of Queue - Vehicles (Worst Lane) 87.7 veh<br />

95% Back of Queue - Distance (Worst Lane) 2209.6 ft<br />

Total Effective Stops 18841 veh/h 22610 pers/h<br />

Effective Stop Rate 2.66 per veh 2.65 per pers<br />

Proportion Queued 0.87 0.87<br />

Performance Index 533.6 533.6<br />

Travel Distance (Total) 2577.8 veh-mi/h 3093.4 pers-mi/h<br />

Travel Distance (Average) 1920 ft 1918 ft<br />

Travel Time (Total) 259.4 veh-h/h 311.3 pers-h/h<br />

Travel Time (Average) 131.7 sec 131.6 sec<br />

Travel Speed 9.9 mph 9.9 mph<br />

Cost (Total) 3552.87 $/h 3552.87 $/h<br />

Fuel Consumption (Total)<br />

200.3 gal/h<br />

Carbon Dioxide (Total)<br />

1896.3 kg/h<br />

Hydrocarbons (Total)<br />

3.659 kg/h<br />

Carbon Monoxide (Total)<br />

131.02 kg/h<br />

NOx (Total)<br />

3.656 kg/h<br />

LOS (Aver. Int. Delay) for Vehicles is based on average delay for all vehicle movements. LOS Method: Delay (HCM).<br />

LOS Method for individual vehicle movements and lanes: Delay (HCM).<br />

Roundabout LOS Method: Same as Signalised Intersections.<br />

Roundabout Capacity Model: SIDRA Standard.<br />

Intersection Performance - Annual Values<br />

Performance Measure Vehicles Persons<br />

Demand Flows (Total) 3,402,839 veh/y 4,088,207 pers/y<br />

Delay 89,706 veh-h/y 107,647 pers-h/y<br />

Effective Stops 9,043,874 veh/y 10,852,650 pers/y<br />

Travel Distance 1,237,356 veh-mi/y 1,484,828 pers-mi/y<br />

Travel Time 124,529 veh-h/y 149,434 pers-h/y<br />

Cost 1,705,379 $/y 1,705,379 $/y<br />

Fuel Consumption<br />

96,145 gal/y<br />

Carbon Dioxide<br />

910,235 kg/y<br />

Hydrocarbons<br />

1,757 kg/y<br />

Carbon Monoxide<br />

62,891 kg/y<br />

NOx<br />

1,755 kg/y<br />

Processed: Thursday, February 10, 2011 10:49:35 AM Copyright © 2000-2010 Akcelik & Associates Pty Ltd<br />

SIDRA INTERSECTION 5.0.5.1510<br />

www.sidrasolutions.<strong>com</strong><br />

Project: P:\S\SPTR00000001\0600INFO\<strong>Traffic</strong>\February-2011-TIA\Sidra\Craig-Hwy.2\2032 Alt1-Buildout-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!