21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

HCM Unsignalized Intersection Capacity <strong>Analysis</strong><br />

16: North Access & Craig Road 2/8/2011<br />

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR<br />

Lane Configurations<br />

Volume (veh/h) 129 0 42 0 0 0 28 250 0 0 208 115<br />

Sign Control Stop Stop Free Free<br />

Grade 0% 0% 0% 0%<br />

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92<br />

Hourly flow rate (vph) 140 0 46 0 0 0 30 272 0 0 226 125<br />

Pedestrians<br />

Lane Width (ft)<br />

Walking Speed (ft/s)<br />

Percent Blockage<br />

Right turn flare (veh)<br />

Median type TWLTL TWLTL<br />

Median storage veh) 2 2<br />

Upstream signal (ft)<br />

pX, platoon unblocked<br />

vC, conflicting volume 559 559 226 604 684 272 351 272<br />

vC1, stage 1 conf vol 226 226 333 333<br />

vC2, stage 2 conf vol 333 333 272 351<br />

vCu, unblocked vol 559 559 226 604 684 272 351 272<br />

tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1<br />

tC, 2 stage (s) 6.1 5.5 6.1 5.5<br />

tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2<br />

p0 queue free % 77 100 94 100 100 100 97 100<br />

cM capacity (veh/h) 600 569 813 555 517 767 1208 1292<br />

Direction, Lane # EB 1 EB 2 WB 1 NB 1 NB 2 SB 1 SB 2<br />

Volume Total 140 46 0 30 272 226 125<br />

Volume Left 140 0 0 30 0 0 0<br />

Volume Right 0 46 0 0 0 0 125<br />

cSH 600 813 1700 1208 1700 1700 1700<br />

Volume to Capacity 0.23 0.06 0.00 0.03 0.16 0.13 0.07<br />

Queue Length 95th (ft) 23 4 0 2 0 0 0<br />

Control Delay (s) 12.8 9.7 0.0 8.1 0.0 0.0 0.0<br />

Lane LOS B A A A<br />

Approach Delay (s) 12.1 0.0 0.8 0.0<br />

Approach LOS B A<br />

Intersection Summary<br />

Average Delay 3.0<br />

Intersection Capacity Utilization 31.4% ICU Level of Service A<br />

<strong>Analysis</strong> Period (min) 15<br />

Description: SB Right Turn Lane (100')<br />

2012 plus Project, Alt. 1, PH1 Synchro 7 - Report<br />

cak Page 16

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!