21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

HCM Signalized Intersection Capacity <strong>Analysis</strong><br />

1: Hwy. 2 & Craig Road 2/8/2011<br />

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR<br />

Lane Configurations<br />

Volume (vph) 142 1632 258 86 1419 309 195 99 73 236 85 107<br />

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900<br />

Total Lost time (s) 5.5 5.5 5.5 5.5 5.5 5.5 5.0 5.0 5.0 5.0<br />

Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00<br />

Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 0.94 1.00 0.92<br />

Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 0.95 1.00<br />

Satd. Flow (prot) 1787 3574 1599 1787 3574 1599 1787 1762 1787 1724<br />

Flt Permitted 0.95 1.00 1.00 0.95 1.00 1.00 0.38 1.00 0.38 1.00<br />

Satd. Flow (perm) 1787 3574 1599 1787 3574 1599 721 1762 720 1724<br />

Peak-hour factor, PHF 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93<br />

Adj. Flow (vph) 153 1755 277 92 1526 332 210 106 78 254 91 115<br />

RTOR Reduction (vph) 0 0 69 0 0 157 0 26 0 0 45 0<br />

Lane Group Flow (vph) 153 1755 208 92 1526 175 210 158 0 254 161 0<br />

Heavy Vehicles (%) 1% 1% 1% 1% 1% 1% 1% 1% 1% 1% 1% 1%<br />

Turn Type Prot Perm Prot Perm pm+pt pm+pt<br />

Protected Phases 5 2 1 6 3 8 7 4<br />

Permitted Phases 2 6 8 4<br />

Actuated Green, G (s) 10.7 64.7 64.7 6.5 60.5 60.5 21.8 16.8 23.8 17.8<br />

Effective Green, g (s) 10.7 64.7 64.7 6.5 60.5 60.5 21.8 16.8 23.8 17.8<br />

Actuated g/C Ratio 0.09 0.56 0.56 0.06 0.53 0.53 0.19 0.15 0.21 0.15<br />

Clearance Time (s) 5.5 5.5 5.5 5.5 5.5 5.5 5.0 5.0 5.0 5.0<br />

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0<br />

Lane Grp Cap (vph) 166 2011 900 101 1880 841 183 257 205 267<br />

v/s Ratio Prot c0.09 c0.49 0.05 0.43 0.05 0.09 c0.06 0.09<br />

v/s Ratio Perm 0.13 0.11 0.17 c0.19<br />

v/c Ratio 0.92 0.87 0.23 0.91 0.81 0.21 1.15 0.62 1.24 0.60<br />

Uniform Delay, d1 51.7 21.6 12.6 54.0 22.5 14.5 46.4 46.1 45.2 45.3<br />

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00<br />

Incremental Delay, d2 47.4 5.6 0.6 61.5 3.9 0.6 111.8 4.3 142.0 3.8<br />

Delay (s) 99.2 27.2 13.2 115.5 26.5 15.1 158.2 50.4 187.2 49.1<br />

Level of Service F C B F C B F D F D<br />

Approach Delay (s) 30.5 28.7 107.9 125.4<br />

Approach LOS C C F F<br />

Intersection Summary<br />

HCM Average Control Delay 44.7 HCM Level of Service D<br />

HCM Volume to Capacity ratio 0.96<br />

Actuated Cycle Length (s) 115.0 Sum of lost time (s) 16.0<br />

Intersection Capacity Utilization 90.1% ICU Level of Service E<br />

<strong>Analysis</strong> Period (min) 15<br />

Description: Signalized, Optimized<br />

c Critical Lane Group<br />

2015 plus Project, Alt. 1, PH2-Mitigation Synchro 7 - Report<br />

cak Page 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!