21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

HCM Unsignalized Intersection Capacity <strong>Analysis</strong><br />

17: Middle Access & Craig Road 2/10/2011<br />

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR<br />

Lane Configurations<br />

Volume (veh/h) 46 0 63 0 0 0 69 840 0 0 656 49<br />

Sign Control Stop Stop Free Free<br />

Grade 0% 0% 0% 0%<br />

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92<br />

Hourly flow rate (vph) 50 0 68 0 0 0 75 913 0 0 713 53<br />

Pedestrians<br />

Lane Width (ft)<br />

Walking Speed (ft/s)<br />

Percent Blockage<br />

Right turn flare (veh)<br />

Median type TWLTL TWLTL<br />

Median storage veh) 2 2<br />

Upstream signal (ft)<br />

pX, platoon unblocked<br />

vC, conflicting volume 1803 1803 740 1871 1829 913 766 913<br />

vC1, stage 1 conf vol 740 740 1063 1063<br />

vC2, stage 2 conf vol 1063 1063 808 766<br />

vCu, unblocked vol 1803 1803 740 1871 1829 913 766 913<br />

tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1<br />

tC, 2 stage (s) 6.1 5.5 6.1 5.5<br />

tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2<br />

p0 queue free % 76 100 84 100 100 100 91 100<br />

cM capacity (veh/h) 211 233 417 171 217 331 847 746<br />

Direction, Lane # EB 1 EB 2 WB 1 NB 1 NB 2 SB 1<br />

Volume Total 50 68 0 75 913 766<br />

Volume Left 50 0 0 75 0 0<br />

Volume Right 0 68 0 0 0 53<br />

cSH 211 417 1700 847 1700 1700<br />

Volume to Capacity 0.24 0.16 0.00 0.09 0.54 0.45<br />

Queue Length 95th (ft) 22 15 0 7 0 0<br />

Control Delay (s) 27.3 15.3 0.0 9.7 0.0 0.0<br />

Lane LOS D C A A<br />

Approach Delay (s) 20.4 0.0 0.7 0.0<br />

Approach LOS C A<br />

Intersection Summary<br />

Average Delay 1.7<br />

Intersection Capacity Utilization 55.2% ICU Level of Service B<br />

<strong>Analysis</strong> Period (min) 15<br />

West Plains Development <strong>Traffic</strong> <strong>Impact</strong> <strong>Analysis</strong><br />

Synchro 7 - Report<br />

2032 Alternative 1 Buildout Page 17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!