21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

HCM Signalized Intersection Capacity <strong>Analysis</strong><br />

3: Hwy. 2 & Lawson St 1/18/2011<br />

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR<br />

Lane Configurations<br />

Volume (vph) 60 1571 13 93 1097 52 60 44 94 89 39 42<br />

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900<br />

Total Lost time (s) 5.0 5.0 5.0 5.0 4.0 4.0 4.0 4.0<br />

Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 1.00<br />

Frt 1.00 1.00 1.00 0.99 1.00 0.85 1.00 0.85<br />

Flt Protected 0.95 1.00 0.95 1.00 0.97 1.00 0.97 1.00<br />

Satd. Flow (prot) 1787 3570 1787 3550 1828 1599 1818 1599<br />

Flt Permitted 0.95 1.00 0.95 1.00 0.57 1.00 0.60 1.00<br />

Satd. Flow (perm) 1787 3570 1787 3550 1070 1599 1122 1599<br />

Peak-hour factor, PHF 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93<br />

Adj. Flow (vph) 65 1689 14 100 1180 56 65 47 101 96 42 45<br />

RTOR Reduction (vph) 0 0 0 0 2 0 0 0 53 0 0 20<br />

Lane Group Flow (vph) 65 1703 0 100 1234 0 0 112 48 0 138 25<br />

Heavy Vehicles (%) 1% 1% 1% 1% 1% 1% 1% 1% 1% 1% 1% 1%<br />

Turn Type Prot Prot Perm Perm Perm Perm<br />

Protected Phases 1 6 5 2 4 8<br />

Permitted Phases 4 4 8 8<br />

Actuated Green, G (s) 9.0 87.0 12.8 90.8 20.2 20.2 20.2 20.2<br />

Effective Green, g (s) 9.0 87.0 12.8 90.8 20.2 20.2 20.2 20.2<br />

Actuated g/C Ratio 0.07 0.65 0.10 0.68 0.15 0.15 0.15 0.15<br />

Clearance Time (s) 5.0 5.0 5.0 5.0 4.0 4.0 4.0 4.0<br />

Vehicle Extension (s) 3.0 3.8 3.0 2.5 3.0 3.0 3.0 3.0<br />

Lane Grp Cap (vph) 120 2318 171 2406 161 241 169 241<br />

v/s Ratio Prot 0.04 c0.48 c0.06 c0.35<br />

v/s Ratio Perm 0.10 0.03 c0.12 0.02<br />

v/c Ratio 0.54 0.73 0.58 0.51 0.70 0.20 0.82 0.11<br />

Uniform Delay, d1 60.5 15.8 58.1 10.7 54.0 49.8 55.1 49.1<br />

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00<br />

Incremental Delay, d2 4.9 2.1 5.0 0.8 12.3 0.4 25.3 0.2<br />

Delay (s) 65.4 17.9 63.1 11.5 66.3 50.2 80.4 49.3<br />

Level of Service E B E B E D F D<br />

Approach Delay (s) 19.6 15.3 58.7 72.7<br />

Approach LOS B B E E<br />

Intersection Summary<br />

HCM Average Control Delay 23.1 HCM Level of Service C<br />

HCM Volume to Capacity ratio 0.76<br />

Actuated Cycle Length (s) 134.0 Sum of lost time (s) 19.0<br />

Intersection Capacity Utilization 74.3% ICU Level of Service D<br />

<strong>Analysis</strong> Period (min) 15<br />

c Critical Lane Group<br />

2019 PM Peak Hour Background Conditions Synchro 7 - Report<br />

cak Page 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!