21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

HCM Signalized Intersection Capacity <strong>Analysis</strong><br />

3: Hwy. 2 & Lawson St 2/14/2011<br />

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR<br />

Lane Configurations<br />

Volume (vph) 84 2343 37 113 1743 63 93 54 114 108 47 61<br />

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900<br />

Total Lost time (s) 5.0 5.0 5.0 5.0 5.0 5.0 4.0 4.0 4.0 4.0<br />

Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 1.00 1.00 1.00 1.00 1.00<br />

Frt 1.00 1.00 0.85 1.00 1.00 0.85 1.00 0.90 1.00 0.92<br />

Flt Protected 0.95 1.00 1.00 0.95 1.00 1.00 0.95 1.00 0.95 1.00<br />

Satd. Flow (prot) 1787 3574 1599 1787 3574 1599 1787 1689 1787 1722<br />

Flt Permitted 0.05 1.00 1.00 0.05 1.00 1.00 0.57 1.00 0.40 1.00<br />

Satd. Flow (perm) 91 3574 1599 91 3574 1599 1075 1689 758 1722<br />

Peak-hour factor, PHF 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93<br />

Adj. Flow (vph) 90 2519 40 122 1874 68 100 58 123 116 51 66<br />

RTOR Reduction (vph) 0 0 6 0 0 14 0 55 0 0 37 0<br />

Lane Group Flow (vph) 90 2519 34 122 1874 54 100 126 0 116 80 0<br />

Heavy Vehicles (%) 1% 1% 1% 1% 1% 1% 1% 1% 1% 1% 1% 1%<br />

Turn Type pm+pt Perm pm+pt Perm Perm Perm<br />

Protected Phases 1 6 5 2 4 8<br />

Permitted Phases 6 6 2 2 4 8<br />

Actuated Green, G (s) 88.3 88.3 88.3 87.3 87.3 87.3 21.4 21.4 21.4 21.4<br />

Effective Green, g (s) 88.3 88.3 88.3 87.3 87.3 87.3 21.4 21.4 21.4 21.4<br />

Actuated g/C Ratio 0.69 0.69 0.69 0.68 0.68 0.68 0.17 0.17 0.17 0.17<br />

Clearance Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 4.0 4.0 4.0 4.0<br />

Vehicle Extension (s) 3.0 3.8 3.8 3.0 2.5 2.5 3.0 3.0 3.0 3.0<br />

Lane Grp Cap (vph) 142 2452 1097 128 2424 1085 179 281 126 286<br />

v/s Ratio Prot 0.03 c0.70 0.04 c0.52 0.07 0.05<br />

v/s Ratio Perm 0.40 0.02 0.61 0.03 0.09 c0.15<br />

v/c Ratio 0.63 1.03 0.03 0.95 0.77 0.05 0.56 0.45 0.92 0.28<br />

Uniform Delay, d1 22.6 20.2 6.5 58.2 14.0 6.9 49.3 48.3 52.8 46.9<br />

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00<br />

Incremental Delay, d2 8.9 25.6 0.0 64.7 1.5 0.0 3.7 1.1 56.2 0.5<br />

Delay (s) 31.5 45.8 6.5 122.8 15.5 6.9 53.1 49.5 109.0 47.5<br />

Level of Service C D A F B A D D F D<br />

Approach Delay (s) 44.7 21.6 50.7 78.1<br />

Approach LOS D C D E<br />

Intersection Summary<br />

HCM Average Control Delay 37.4 HCM Level of Service D<br />

HCM Volume to Capacity ratio 0.97<br />

Actuated Cycle Length (s) 128.7 Sum of lost time (s) 9.0<br />

Intersection Capacity Utilization 101.9% ICU Level of Service G<br />

<strong>Analysis</strong> Period (min) 15<br />

Description: Optimized<br />

Add EB/WB Rt Turn Bays, Reconfigure N/S approaches<br />

c Critical Lane Group<br />

West Plains Development <strong>Traffic</strong> <strong>Impact</strong> <strong>Analysis</strong><br />

Synchro 7 - Report<br />

2032-Alternative 2 Buildout-Mitigated Page 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!