21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

HCM Unsignalized Intersection Capacity <strong>Analysis</strong><br />

10: SR-902 & Craig 1/18/2011<br />

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR<br />

Lane Configurations<br />

Volume (veh/h) 52 284 9 14 284 24 5 49 5 44 81 169<br />

Sign Control Free Free Stop Stop<br />

Grade 0% 0% 0% 0%<br />

Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90<br />

Hourly flow rate (vph) 58 316 10 16 316 27 6 54 6 49 90 188<br />

Pedestrians<br />

Lane Width (ft)<br />

Walking Speed (ft/s)<br />

Percent Blockage<br />

Right turn flare (veh)<br />

Median type None None<br />

Median storage veh)<br />

Upstream signal (ft)<br />

pX, platoon unblocked<br />

vC, conflicting volume 342 326 1016 809 321 824 801 329<br />

vC1, stage 1 conf vol<br />

vC2, stage 2 conf vol<br />

vCu, unblocked vol 342 326 1016 809 321 824 801 329<br />

tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2<br />

tC, 2 stage (s)<br />

tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3<br />

p0 queue free % 95 99 95 82 99 80 70 74<br />

cM capacity (veh/h) 1222 1245 117 296 720 239 300 715<br />

Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 SB 1<br />

Volume Total 58 326 16 342 66 327<br />

Volume Left 58 0 16 0 6 49<br />

Volume Right 0 10 0 27 6 188<br />

cSH 1222 1700 1245 1700 274 426<br />

Volume to Capacity 0.05 0.19 0.01 0.20 0.24 0.77<br />

Queue Length 95th (ft) 4 0 1 0 23 162<br />

Control Delay (s) 8.1 0.0 7.9 0.0 22.2 36.4<br />

Lane LOS A A C E<br />

Approach Delay (s) 1.2 0.3 22.2 36.4<br />

Approach LOS C E<br />

Intersection Summary<br />

Average Delay 12.3<br />

Intersection Capacity Utilization 53.5% ICU Level of Service A<br />

<strong>Analysis</strong> Period (min) 15<br />

Description: Add Southbound Right Turn Lane (100')<br />

2015 PM Peak Hour Background Conditions Synchro 7 - Report<br />

cak Page 10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!