Hwy 2 / Fairchild AFB: Modify signal timing. Add NB left turn lane and WB thru lane.<br />

Project Proportional Share: 6.9%<br />

Resulting LOS & Delay (sec): D/48.9<br />

General Re<strong>com</strong>mendations Applying to All Project Alternatives<br />

Roadway frontage improvements and driveway approaches including curb & gutter and sidewalks or<br />

shared use pathways should be constructed along the site frontages and <strong>com</strong>ply with current County,<br />

WSDOT and/or City of Airway Heights roadway standards. Said improvements should be constructed<br />

as adjacent areas of the subject site are developed.<br />

The Spokane Tribe should work with the Spokane Transit Authority to identify opportunities (if any) to<br />

provide transit access near the project site. Furthermore, the Tribe should look to reduce vehicular trips<br />

to/from the site through employee trip reductions programs, employee shuttles and other similar means<br />

of achieving <strong>com</strong>mute trip reduction.<br />

West Plains Development – Spokane Tribe Page | 93<br />

<strong>Traffic</strong> <strong>Impact</strong> <strong>Analysis</strong> April 28, 2011