21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

HCM Signalized Intersection Capacity <strong>Analysis</strong><br />

11: Hwy. 2 & Fairchild AFB 2/14/2011<br />

Movement EBT EBR WBL WBT NBL NBR<br />

Lane Configurations<br />

Volume (vph) 734 60 591 798 439 1214<br />

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900<br />

Total Lost time (s) 6.0 6.0 6.0 6.0 4.0 4.0<br />

Lane Util. Factor 0.95 1.00 0.97 1.00 1.00 1.00<br />

Frt 1.00 0.85 1.00 1.00 1.00 0.85<br />

Flt Protected 1.00 1.00 0.95 1.00 0.95 1.00<br />

Satd. Flow (prot) 3471 1553 3467 1881 1805 1615<br />

Flt Permitted 1.00 1.00 0.95 1.00 0.95 1.00<br />

Satd. Flow (perm) 3471 1553 3467 1881 1805 1615<br />

Peak-hour factor, PHF 0.72 0.72 0.72 0.72 0.72 0.72<br />

Adj. Flow (vph) 1019 83 821 1108 610 1686<br />

RTOR Reduction (vph) 0 59 0 0 0 0<br />

Lane Group Flow (vph) 1019 24 821 1108 610 1686<br />

Heavy Vehicles (%) 4% 4% 1% 1% 0% 0%<br />

Turn Type Perm Prot Free<br />

Protected Phases 6 5 2 4<br />

Permitted Phases 6 Free<br />

Actuated Green, G (s) 23.0 23.0 19.0 48.0 27.0 85.0<br />

Effective Green, g (s) 23.0 23.0 19.0 48.0 27.0 85.0<br />

Actuated g/C Ratio 0.27 0.27 0.22 0.56 0.32 1.00<br />

Clearance Time (s) 6.0 6.0 6.0 6.0 4.0<br />

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0<br />

Lane Grp Cap (vph) 939 420 775 1062 573 1615<br />

v/s Ratio Prot 0.29 0.24 0.59 0.34<br />

v/s Ratio Perm 0.02 c1.04<br />

v/c Ratio 1.09 0.06 1.06 1.04 1.06 1.04<br />

Uniform Delay, d1 31.0 23.0 33.0 18.5 29.0 42.5<br />

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00<br />

Incremental Delay, d2 55.3 0.1 49.2 39.6 56.0 34.8<br />

Delay (s) 86.3 23.0 82.2 58.1 85.0 77.3<br />

Level of Service F C F E F E<br />

Approach Delay (s) 81.5 68.4 79.3<br />

Approach LOS F E E<br />

Intersection Summary<br />

HCM Average Control Delay 75.8 HCM Level of Service E<br />

HCM Volume to Capacity ratio 1.04<br />

Actuated Cycle Length (s) 85.0 Sum of lost time (s) 0.0<br />

Intersection Capacity Utilization 74.8% ICU Level of Service D<br />

<strong>Analysis</strong> Period (min) 15<br />

c Critical Lane Group<br />

West Plains Development <strong>Traffic</strong> <strong>Impact</strong> <strong>Analysis</strong><br />

Synchro 7 - Report<br />

2032 Alternative 2 Buildout Page 11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!