21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

HCM Signalized Intersection Capacity <strong>Analysis</strong><br />

11: Hwy. 2 & Fairchild AFB 2/8/2011<br />

Movement EBT EBR WBL WBT NBL NBR<br />

Lane Configurations<br />

Volume (vph) 552 49 403 632 361 871<br />

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900<br />

Total Lost time (s) 6.0 6.0 6.0 6.0 4.0 4.0<br />

Lane Util. Factor 0.95 1.00 0.97 1.00 1.00 1.00<br />

Frt 1.00 0.85 1.00 1.00 1.00 0.85<br />

Flt Protected 1.00 1.00 0.95 1.00 0.95 1.00<br />

Satd. Flow (prot) 3471 1553 3467 1881 1805 1615<br />

Flt Permitted 1.00 1.00 0.95 1.00 0.95 1.00<br />

Satd. Flow (perm) 3471 1553 3467 1881 1805 1615<br />

Peak-hour factor, PHF 0.72 0.72 0.72 0.72 0.72 0.72<br />

Adj. Flow (vph) 767 68 560 878 501 1210<br />

RTOR Reduction (vph) 0 50 0 0 0 0<br />

Lane Group Flow (vph) 767 18 560 878 501 1210<br />

Heavy Vehicles (%) 4% 4% 1% 1% 0% 0%<br />

Turn Type Perm Prot Free<br />

Protected Phases 6 5 2 4<br />

Permitted Phases 6 Free<br />

Actuated Green, G (s) 20.3 20.3 14.6 40.9 24.4 75.3<br />

Effective Green, g (s) 20.3 20.3 14.6 40.9 24.4 75.3<br />

Actuated g/C Ratio 0.27 0.27 0.19 0.54 0.32 1.00<br />

Clearance Time (s) 6.0 6.0 6.0 6.0 4.0<br />

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0<br />

Lane Grp Cap (vph) 936 419 672 1022 585 1615<br />

v/s Ratio Prot 0.22 0.16 c0.47 0.28<br />

v/s Ratio Perm 0.01 c0.75<br />

v/c Ratio 0.82 0.04 0.83 0.86 0.86 0.75<br />

Uniform Delay, d1 25.8 20.3 29.2 14.7 23.8 0.0<br />

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00<br />

Incremental Delay, d2 5.7 0.0 8.7 7.3 11.8 3.2<br />

Delay (s) 31.5 20.4 37.9 22.0 35.6 3.2<br />

Level of Service C C D C D A<br />

Approach Delay (s) 30.6 28.2 12.7<br />

Approach LOS C C B<br />

Intersection Summary<br />

HCM Average Control Delay 22.1 HCM Level of Service C<br />

HCM Volume to Capacity ratio 0.82<br />

Actuated Cycle Length (s) 75.3 Sum of lost time (s) 6.0<br />

Intersection Capacity Utilization 61.6% ICU Level of Service B<br />

<strong>Analysis</strong> Period (min) 15<br />

c Critical Lane Group<br />

2015 plus Project, Alt. 1, PH2 Synchro 7 - Report<br />

cak Page 11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!