21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

INTERSECTION SUMMARY<br />

Craig Rd./Hwy. (YEAR 2012 PM PEAK, ALT.2. Buildout)<br />

West Plains Development<br />

Roundabout<br />

Site: Roundabout<br />

Intersection Performance - Hourly Values<br />

Performance Measure Vehicles Persons<br />

Demand Flows (Total) 4212 veh/h 5064 pers/h<br />

Percent Heavy Vehicles 1.0 %<br />

Degree of Saturation 0.693<br />

Practical Spare Capacity 22.6 %<br />

Effective Intersection Capacity<br />

6076 veh/h<br />

Control Delay (Total) 9.13 veh-h/h 10.95 pers-h/h<br />

Control Delay (Average) 7.8 sec 7.8 sec<br />

Control Delay (Worst Lane)<br />

21.4 sec<br />

Control Delay (Worst Movement) 21.4 sec 21.4 sec<br />

Geometric Delay (Average)<br />

4.4 sec<br />

Stop-Line Delay (Average)<br />

3.4 sec<br />

Level of Service (Aver. Int. Delay)<br />

LOS A<br />

Level of Service (Worst Movement)<br />

LOS C<br />

Level of Service (Worst Lane)<br />

LOS C<br />

95% Back of Queue - Vehicles (Worst Lane) 8.3 veh<br />

95% Back of Queue - Distance (Worst Lane) 209.0 ft<br />

Total Effective Stops 2916 veh/h 3499 pers/h<br />

Effective Stop Rate 0.69 per veh 0.69 per pers<br />

Proportion Queued 0.66 0.65<br />

Performance Index 81.7 81.7<br />

Travel Distance (Total) 1522.6 veh-mi/h 1827.1 pers-mi/h<br />

Travel Distance (Average) 1909 ft 1905 ft<br />

Travel Time (Total) 53.3 veh-h/h 64.0 pers-h/h<br />

Travel Time (Average) 45.6 sec 45.5 sec<br />

Travel Speed 28.5 mph 28.5 mph<br />

Cost (Total) 866.26 $/h 866.26 $/h<br />

Fuel Consumption (Total)<br />

66.8 gal/h<br />

Carbon Dioxide (Total)<br />

632.5 kg/h<br />

Hydrocarbons (Total)<br />

1.036 kg/h<br />

Carbon Monoxide (Total)<br />

44.76 kg/h<br />

NOx (Total)<br />

1.414 kg/h<br />

LOS (Aver. Int. Delay) for Vehicles is based on average delay for all vehicle movements. LOS Method: Delay (HCM).<br />

LOS Method for individual vehicle movements and lanes: Delay (HCM).<br />

Roundabout LOS Method: Same as Signalised Intersections.<br />

Roundabout Capacity Model: SIDRA Standard.<br />

Intersection Performance - Annual Values<br />

Performance Measure Vehicles Persons<br />

Demand Flows (Total) 2,021,678 veh/y 2,430,813 pers/y<br />

Delay 4,380 veh-h/y 5,256 pers-h/y<br />

Effective Stops 1,399,521 veh/y 1,679,426 pers/y<br />

Travel Distance 730,851 veh-mi/y 877,022 pers-mi/y<br />

Travel Time 25,604 veh-h/y 30,724 pers-h/y<br />

Cost 415,806 $/y 415,806 $/y<br />

Fuel Consumption<br />

32,070 gal/y<br />

Carbon Dioxide<br />

303,620 kg/y<br />

Hydrocarbons<br />

497 kg/y<br />

Carbon Monoxide<br />

21,484 kg/y<br />

NOx<br />

679 kg/y<br />

Processed: Tuesday, February 08, 2011 1:27:31 PM Copyright © 2000-2010 Akcelik & Associates Pty Ltd<br />

SIDRA INTERSECTION 5.0.5.1510<br />

www.sidrasolutions.<strong>com</strong><br />

Project: P:\S\SPTR00000001\0600INFO\<strong>Traffic</strong>\February-2011-TIA\Sidra\Craig-Hwy.2\Alt2-Buildout-Craig.sip

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!