21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

HCM Signalized Intersection Capacity <strong>Analysis</strong><br />

11: Hwy. 2 & Fairchild AFB 1/24/2011<br />

Movement EBT EBR WBL WBT NBL NBR<br />

Lane Configurations<br />

Volume (vph) 348 49 216 442 361 645<br />

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900<br />

Total Lost time (s) 6.0 6.0 6.0 6.0 4.0 4.0<br />

Lane Util. Factor 0.95 1.00 0.97 1.00 1.00 1.00<br />

Frt 1.00 0.85 1.00 1.00 1.00 0.85<br />

Flt Protected 1.00 1.00 0.95 1.00 0.95 1.00<br />

Satd. Flow (prot) 3471 1553 3467 1881 1805 1615<br />

Flt Permitted 1.00 1.00 0.95 1.00 0.95 1.00<br />

Satd. Flow (perm) 3471 1553 3467 1881 1805 1615<br />

Peak-hour factor, PHF 0.72 0.72 0.72 0.72 0.72 0.72<br />

Adj. Flow (vph) 483 68 300 614 501 896<br />

RTOR Reduction (vph) 0 54 0 0 0 0<br />

Lane Group Flow (vph) 483 14 300 614 501 896<br />

Heavy Vehicles (%) 4% 4% 1% 1% 0% 0%<br />

Turn Type Perm Prot Free<br />

Protected Phases 6 5 2 4<br />

Permitted Phases 6 Free<br />

Actuated Green, G (s) 12.3 12.3 8.1 26.4 22.3 58.7<br />

Effective Green, g (s) 12.3 12.3 8.1 26.4 22.3 58.7<br />

Actuated g/C Ratio 0.21 0.21 0.14 0.45 0.38 1.00<br />

Clearance Time (s) 6.0 6.0 6.0 6.0 4.0<br />

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0<br />

Lane Grp Cap (vph) 727 325 478 846 686 1615<br />

v/s Ratio Prot 0.14 0.09 c0.33 c0.28<br />

v/s Ratio Perm 0.01 0.55<br />

v/c Ratio 0.66 0.04 0.63 0.73 0.73 0.55<br />

Uniform Delay, d1 21.3 18.5 23.9 13.2 15.6 0.0<br />

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00<br />

Incremental Delay, d2 2.3 0.1 2.6 3.1 4.0 1.4<br />

Delay (s) 23.6 18.6 26.5 16.3 19.6 1.4<br />

Level of Service C B C B B A<br />

Approach Delay (s) 23.0 19.6 7.9<br />

Approach LOS C B A<br />

Intersection Summary<br />

HCM Average Control Delay 14.6 HCM Level of Service B<br />

HCM Volume to Capacity ratio 0.73<br />

Actuated Cycle Length (s) 58.7 Sum of lost time (s) 10.0<br />

Intersection Capacity Utilization 51.6% ICU Level of Service A<br />

<strong>Analysis</strong> Period (min) 15<br />

c Critical Lane Group<br />

Existing PM Peak Hour Conditions<br />

Synchro 7 - Report<br />

cak Page 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!