2019 (Phase 3) Mitigations:<br />

<br />

<br />

<br />

<br />

<br />

Hwy 2 / Craig: Install traffic signal and widen/improve intersection approaches to include dual<br />

EB, NB and SB left turn lanes and a 2 nd NB thru lane. Alternatively, consider installation of a<br />

roundabout.<br />

Project Proportional Share: 34.3%<br />

Resulting LOS & Delay (sec): D/52.7 / D/47.4 (roundabout)<br />

Hwy 2 / Lundstrom: Restripe and widen approaches to ac<strong>com</strong>modate exclusive NB and SB right<br />

turn lanes.<br />

Project Proportional Share: 29.4%<br />

Resulting LOS & Delay (sec): F/179.6<br />

Hwy 2 / Garfield: Optimize signal timing.<br />

Project Proportional Share: 23.7%<br />

Resulting LOS & Delay (sec): D/52.5<br />

Hwy 2 / Hayford: Optimize signal timing and consider converting the inside SB thru land to a<br />

2 nd SB left turn lane. Widen the EB and NB approaches for exclusive right turn lanes. Restripe<br />

the wide paved median for a 2 nd WB left turn lane. Add 2 nd NB left turn lane. Alternatively, add<br />

a 2 nd NB left turn lane and a WB auxiliary lane.<br />

Project Proportional Share: 18.0%<br />

Resulting LOS & Delay (sec): F/97.1 / D/51.3 (alternative)<br />

Craig / SR 902: Install traffic signal or consider installation of a roundabout.<br />

Project Proportional Share: 31.1%<br />

Resulting LOS & Delay (sec): B/17.6 / B/10.4 (roundabout)<br />

Hwy 2 / Middle Driveway: Install traffic signal and approach improvements (SB Middle<br />

Driveway); install a WB right turn lane. Alternatively, consider installation of a roundabout.<br />

Project Proportional Share: 100%<br />

Resulting LOS & Delay (sec): D/45.4 / E/61.3 (roundabout<br />

<br />

Craig / Sixth Ave.: Widen the intersection approach to provide and exclusive NB right turn lane.<br />

Project Proportional Share: 38.0%<br />

Resulting LOS & Delay (sec): D/28.8<br />

Note, a failing LOS was identified at the unsignalized intersection of Hwy 2 / Lundstrom under Phase 2<br />

and Phase 3 development conditions. Minor improvements (turn lanes are noted above and in Table 16;<br />

if delays persist at this intersection it is likely that traffic will shift and redistribute to other nearby arterial<br />

intersections at Hwy 2 / Craig Rd. and Hwy 2 / Lawson St., The minor volume shift is not expected to<br />

have an appreciable impact on LOS at the nearby arterial intersections.<br />

Regarding congestion at Hwy 2/Hayford, it is worth noting that development of an alternative east/west<br />

route through Airway Heights along the alignment of 21 st Ave. is under consideration by the City of<br />

Airway Heights, WSDOT Spokane County and the City of Spokane. The intent of this alternative route<br />

is to reduce through volumes on HWY 2 on the West Plains. Our analysis indicates that an acceptable<br />

LOS at Hayford (without a third WB lane) could be achieved with a reduction in east/west through<br />

volumes of approximately 19% with said reduced volume shifting to the new 21 st Ave. route. Note, that<br />

at the time of publishing this report the 21 st Ave. project has not been officially adopted by the agencies<br />

involved or added to the regional transportation improvement plan list of projects. If the 21 st Ave. bypass<br />

is accepted and adopted by the impacted agencies (WSDOT, City of Airway Heights, Spokane<br />

County and City of Spokane) the Spokane Tribe West Plains project could consider make a fair share<br />

contribution to the 21 st Ave. project in lieu of improvements at Hwy 2/Hayford.<br />

West Plains Development – Spokane Tribe Page | 66<br />

<strong>Traffic</strong> <strong>Impact</strong> <strong>Analysis</strong> April 28, 2011