21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

INTERSECTION SUMMARY<br />

Middle Dwy./Hwy. (YEAR 2032 PM PEAK, Alt 1 Buildout)<br />

West Plains Development<br />

Roundabout<br />

Site: Roundabout<br />

Intersection Performance - Hourly Values<br />

Performance Measure Vehicles Persons<br />

Demand Flows (Total) 6177 veh/h 7423 pers/h<br />

Percent Heavy Vehicles 1.0 %<br />

Degree of Saturation 1.702<br />

Practical Spare Capacity -50.0 %<br />

Effective Intersection Capacity<br />

3632 veh/h<br />

Control Delay (Total) 188.68 veh-h/h 226.41 pers-h/h<br />

Control Delay (Average) 110.0 sec 109.8 sec<br />

Control Delay (Worst Lane)<br />

343.4 sec<br />

Control Delay (Worst Movement) 342.2 sec 342.2 sec<br />

Geometric Delay (Average)<br />

5.0 sec<br />

Stop-Line Delay (Average)<br />

105.0 sec<br />

Level of Service (Aver. Int. Delay)<br />

LOS F<br />

Level of Service (Worst Movement)<br />

LOS F<br />

Level of Service (Worst Lane)<br />

LOS F<br />

95% Back of Queue - Vehicles (Worst Lane) 85.5 veh<br />

95% Back of Queue - Distance (Worst Lane) 2154.9 ft<br />

Total Effective Stops 15381 veh/h 18457 pers/h<br />

Effective Stop Rate 2.49 per veh 2.49 per pers<br />

Proportion Queued 0.84 0.83<br />

Performance Index 493.0 493.0<br />

Travel Distance (Total) 2245.7 veh-mi/h 2694.9 pers-mi/h<br />

Travel Distance (Average) 1920 ft 1917 ft<br />

Travel Time (Total) 253.1 veh-h/h 303.7 pers-h/h<br />

Travel Time (Average) 147.5 sec 147.3 sec<br />

Travel Speed 8.9 mph 8.9 mph<br />

Cost (Total) 3358.81 $/h 3358.81 $/h<br />

Fuel Consumption (Total)<br />

178.6 gal/h<br />

Carbon Dioxide (Total)<br />

1690.4 kg/h<br />

Hydrocarbons (Total)<br />

3.287 kg/h<br />

Carbon Monoxide (Total)<br />

106.25 kg/h<br />

NOx (Total)<br />

3.027 kg/h<br />

LOS (Aver. Int. Delay) for Vehicles is based on average delay for all vehicle movements. LOS Method: Delay (HCM).<br />

LOS Method for individual vehicle movements and lanes: Delay (HCM).<br />

Roundabout LOS Method: Same as Signalised Intersections.<br />

Roundabout Capacity Model: SIDRA Standard.<br />

Intersection Performance - Annual Values<br />

Performance Measure Vehicles Persons<br />

Demand Flows (Total) 2,965,044 veh/y 3,562,852 pers/y<br />

Delay 90,565 veh-h/y 108,678 pers-h/y<br />

Effective Stops 7,382,769 veh/y 8,859,322 pers/y<br />

Travel Distance 1,077,954 veh-mi/y 1,293,545 pers-mi/y<br />

Travel Time 121,481 veh-h/y 145,778 pers-h/y<br />

Cost 1,612,226 $/y 1,612,226 $/y<br />

Fuel Consumption<br />

85,706 gal/y<br />

Carbon Dioxide<br />

811,401 kg/y<br />

Hydrocarbons<br />

1,578 kg/y<br />

Carbon Monoxide<br />

50,999 kg/y<br />

NOx<br />

1,453 kg/y<br />

Processed: Thursday, February 10, 2011 11:16:57 AM Copyright © 2000-2010 Akcelik & Associates Pty Ltd<br />

SIDRA INTERSECTION 5.0.5.1510<br />

www.sidrasolutions.<strong>com</strong><br />

Project: P:\S\SPTR00000001\0600INFO\<strong>Traffic</strong>\February-2011-TIA\Sidra\Hwy.2-Middle Dwy\2032 Alt1-Buildout-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!