21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

HCM Signalized Intersection Capacity <strong>Analysis</strong><br />

10: SR-902 & Craig 2/8/2011<br />

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR<br />

Lane Configurations<br />

Volume (vph) 70 284 9 14 284 93 5 108 5 118 145 190<br />

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1000 1900 1900 1900 1900<br />

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0<br />

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00<br />

Frt 1.00 1.00 1.00 0.96 1.00 0.99 1.00 0.91<br />

Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00<br />

Satd. Flow (prot) 1787 1873 1805 1830 1770 973 1787 1721<br />

Flt Permitted 0.28 1.00 0.49 1.00 0.44 1.00 0.58 1.00<br />

Satd. Flow (perm) 519 1873 931 1830 823 973 1088 1721<br />

Peak-hour factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90<br />

Adj. Flow (vph) 78 316 10 16 316 103 6 120 6 131 161 211<br />

RTOR Reduction (vph) 0 2 0 0 19 0 0 3 0 0 78 0<br />

Lane Group Flow (vph) 78 324 0 16 400 0 6 123 0 131 294 0<br />

Heavy Vehicles (%) 1% 1% 1% 0% 0% 0% 2% 2% 2% 1% 1% 1%<br />

Turn Type pm+pt pm+pt pm+pt pm+pt<br />

Protected Phases 7 4 3 8 5 2 1 6<br />

Permitted Phases 4 8 2 6<br />

Actuated Green, G (s) 19.3 17.3 16.5 15.9 14.8 14.2 19.6 16.6<br />

Effective Green, g (s) 19.3 17.3 16.5 15.9 14.8 14.2 19.6 16.6<br />

Actuated g/C Ratio 0.38 0.34 0.32 0.31 0.29 0.28 0.38 0.32<br />

Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0<br />

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0<br />

Lane Grp Cap (vph) 246 634 311 569 249 270 458 559<br />

v/s Ratio Prot c0.01 0.17 0.00 c0.22 0.00 0.13 c0.02 c0.17<br />

v/s Ratio Perm 0.11 0.02 0.01 0.09<br />

v/c Ratio 0.32 0.51 0.05 0.70 0.02 0.46 0.29 0.53<br />

Uniform Delay, d1 11.0 13.5 11.9 15.5 13.0 15.3 10.5 14.0<br />

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00<br />

Incremental Delay, d2 0.7 0.7 0.1 3.9 0.0 1.2 0.3 0.9<br />

Delay (s) 11.8 14.2 11.9 19.5 13.0 16.5 10.9 14.9<br />

Level of Service B B B B B B B B<br />

Approach Delay (s) 13.7 19.2 16.3 13.9<br />

Approach LOS B B B B<br />

Intersection Summary<br />

HCM Average Control Delay 15.6 HCM Level of Service B<br />

HCM Volume to Capacity ratio 0.61<br />

Actuated Cycle Length (s) 51.1 Sum of lost time (s) 16.0<br />

Intersection Capacity Utilization 53.8% ICU Level of Service A<br />

<strong>Analysis</strong> Period (min) 15<br />

Description: Signalized, Optimized<br />

c Critical Lane Group<br />

2012 plus Project, Alt. 1, PH1-Mitigation Synchro 7 - Report<br />

cak Page 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!