Hwy 2 / Hayford: Optimize signal timing and convert the inside SB thru lane to a 2 nd SB left<br />

turn lane.<br />

Project Proportional Share: 15.8%<br />

Resulting LOS & Delay (sec): D/45.9<br />

Craig / SR 902: Install traffic signal or consider installation of a roundabout.<br />

Project Proportional Share: 23.7%<br />

Resulting LOS & Delay (sec): B/15.6 / A/8.6 (roundabout)<br />

Hwy 2 / Middle Driveway: Install traffic signal and approach improvements (SB Middle<br />

Driveway); install a WB right turn lane. Alternatively, consider installation of a roundabout.<br />

Project Proportional Share: 100%<br />

Resulting LOS & Delay (sec): C/31.1 / A/9.8 (roundabout)<br />

Alternative 3<br />

Re<strong>com</strong>mend improvements are summarized below along with the estimated proportional fair share<br />

contribution.<br />

<br />

<br />

<br />

Hwy 2 / Craig: Install traffic signal and widen the NB and SB approaches to provide and<br />

exclusive left turn lane. Alternatively, consider installation of a roundabout.<br />

Project Proportional Share: 30.2%<br />

Resulting LOS & Delay (sec): C/28.2 / A/7.1 (roundabout)<br />

Hwy 2 / Hayford: Optimize signal timing and convert the inside SB thru lane to a 2 nd SB left<br />

turn lane.<br />

Project Proportional Share: 13.6%<br />

Resulting LOS & Delay (sec): D/40.6<br />

Craig / SR 902: Install traffic signal; alternatively, consider installation of a roundabout<br />

Project Proportional Share: 20.6%<br />

Resulting LOS & Delay (sec): B/15.1 / A/8.2<br />

Hwy 2 / Middle Driveway: Install traffic signal and approach improvements (SB Middle<br />

Driveway); install a WB right turn lane. Alternatively, consider installation of a roundabout.<br />

Project Proportional Share: 100%<br />

Resulting LOS & Delay (sec): C/29.3 / A/9.2 (roundabout)<br />

2032 Cumulative Mitigation Improvements<br />

The improvements identified below in addition to the improvements identified above are required to<br />

mitigate 2032 Cumulative With Project conditions.<br />

2032 Alternative 1 Mitigations (in addition to Alt. 1 Ph. 3 2019 mitigations above):<br />

<br />

<br />

<br />

<br />

Hwy 2 / Lundstrom: Consider restriction of NB and SB left turn movements and installation of<br />

EB/WB right turn lanes.<br />

Project Proportional Share: 25.5%<br />

Resulting LOS & Delay (sec): E/42.3<br />

Hwy 2 / Lawson: Modify the signal timing. Modify and widen NB and SB approaches as<br />

necessary to provide dedicated left turn lanes.<br />

Project Proportional Share: 25.1%<br />

Resulting LOS & Delay (sec): D/40.6<br />

Hwy 2 / Garfield: Add 3 rd EB and WB auxiliary through lanes.<br />

Project Proportional Share: 20.4%<br />

Resulting LOS & Delay (sec): C/25.0<br />

Hwy 2 / Fairchild AFB: Modify signal timing. Add NB left turn lane and WB thru lane.<br />

Project Proportional Share: 11.6%<br />

West Plains Development – Spokane Tribe Page | 91<br />

<strong>Traffic</strong> <strong>Impact</strong> <strong>Analysis</strong> April 28, 2011