21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MOVEMENT SUMMARY<br />

Craig Rd./Hwy. 902 (YEAR 2015 PM PEAK, ALT.1,PH.2)<br />

West Plains Development<br />

Roundabout<br />

Site: Roundabout<br />

Movement Performance - Vehicles<br />

Mov ID Turn<br />

Demand<br />

Deg. Average Level of 95% Back of Queue Prop. Effective Average<br />

Flow HV Satn Delay Service Vehicles Distance Queued Stop Rate Speed<br />

veh/h % v/c sec veh ft per veh mph<br />

South: Craig Rd.<br />

3L L 6 2.0 0.242 16.2 LOS B 1.5 38.7 0.65 0.95 28.6<br />

8T T 140 2.0 0.241 9.0 LOS A 1.5 38.7 0.65 0.75 31.4<br />

8R R 6 2.0 0.242 10.0 LOS B 1.5 38.7 0.65 0.79 31.4<br />

Approach 151 2.0 0.241 9.3 LOS B 1.5 38.7 0.65 0.75 31.3<br />

East: SR 902<br />

1L L 16 1.0 0.519 14.5 LOS B 4.2 107.0 0.59 0.85 29.5<br />

6T T 316 1.0 0.511 4.6 LOS A 4.2 107.0 0.59 0.51 29.0<br />

6R R 126 1.0 0.512 6.7 LOS A 4.2 107.0 0.59 0.64 29.1<br />

Approach 457 1.0 0.512 5.5 LOS B 4.2 107.0 0.59 0.56 29.0<br />

North: Craig Rd.<br />

7L L 152 1.0 0.698 16.8 LOS B 8.7 220.1 0.83 0.98 25.3<br />

4T T 179 1.0 0.699 11.5 LOS B 8.7 220.1 0.83 0.89 29.5<br />

4R R 218 1.0 0.698 10.9 LOS B 8.7 220.1 0.83 0.90 27.1<br />

Approach 549 1.0 0.699 12.7 LOS B 8.7 220.1 0.83 0.92 27.2<br />

West: SR 902<br />

5L L 87 1.0 0.606 15.0 LOS B 5.4 136.7 0.71 0.99 26.3<br />

2T T 316 1.0 0.605 8.0 LOS A 5.4 136.7 0.71 0.80 28.5<br />

2R R 10 1.0 0.588 10.6 LOS B 5.4 136.7 0.71 0.85 30.7<br />

Approach 412 1.0 0.604 9.6 LOS B 5.4 136.7 0.71 0.84 28.0<br />

All Vehicles 1569 1.1 0.699 9.4 LOS A 8.7 220.1 0.71 0.78 28.3<br />

Level of Service (Aver. Int. Delay): LOS A. Based on average delay for all vehicle movements. LOS Method: Delay (HCM).<br />

Level of Service (Worst Movement): LOS B. LOS Method for individual vehicle movements: Delay (HCM).<br />

Approach LOS values are based on the worst delay for any vehicle movement.<br />

Roundabout LOS Method: Same as Signalised Intersections.<br />

Roundabout Capacity Model: SIDRA Standard.<br />

Processed: Tuesday, February 08, 2011 2:25:04 PM Copyright © 2000-2010 Akcelik & Associates Pty Ltd<br />

SIDRA INTERSECTION 5.0.5.1510<br />

www.sidrasolutions.<strong>com</strong><br />

Project: P:\S\SPTR00000001\0600INFO\<strong>Traffic</strong>\February-2011-TIA\Sidra\SR902-Craig Rd\Alt1-PH2-SR902.sip<br />

8000011, DAVID EVANS & ASSOCIATES INC, SINGLE

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!