2032 Alternative 2 Mitigations (in addition to Alt. 2 2012 mitigations above):<br />

<br />

<br />

<br />

<br />

<br />

Hwy 2 / Lundstrom: Restripe and widen approaches to ac<strong>com</strong>modate exclusive NB and SB right<br />

turn lanes. Consider restricting NB/SB left turns and adding EB/WB right turn lanes.<br />

Project Proportional Share: 18.9%<br />

Resulting LOS & Delay (sec): D/34.1<br />

Hwy 2 / Lawson: Modify the signal timing. Add EB/WB right turn lanes, reconfigure N/S<br />

approaches.<br />

Project Proportional Share: 18.6%<br />

Resulting LOS & Delay (sec): D/37.4<br />

Hwy 2 / Garfield: Optimize signal timing. Add EB right turn lane, add separate NB left turn lane,<br />

reconfigure SB approach.<br />

Project Proportional Share: 14.8%<br />

Resulting LOS & Delay (sec): E/57.2<br />

Craig / Sixth Ave.: Widen the intersection approach to provide and exclusive NB right turn lane.<br />

Project Proportional Share: 25.6%<br />

Resulting LOS & Delay (sec): D/28.5<br />

Hwy 2 / Fairchild AFB: Modify signal timing. Add NB left turn lane and WB thru lane.<br />

Project Proportional Share: 8.2%<br />

Resulting LOS & Delay (sec): D/50.6<br />

2032 Alternative 3 Mitigations (in addition to Alt. 3 mitigations above):<br />

<br />

<br />

<br />

<br />

<br />

<br />

Hwy 2 / Lundstrom: Restripe and widen approaches to ac<strong>com</strong>modate exclusive NB and SB right<br />

turn lanes. Consider restricting NB/SB left turns and adding EB/WB right turn lanes.<br />

Project Proportional Share: 16.3%<br />

Resulting LOS & Delay (sec): D/32.4<br />

Hwy 2 / Lawson: Modify the signal timing. Reconfigure N/S approaches.<br />

Project Proportional Share: 16.0%<br />

Resulting LOS & Delay (sec): D/37.0<br />

Hwy 2 / Garfield: Optimize signal timing. Add EB right turn lane, add separate NB left turn lane,<br />

reconfigure SB approach.<br />

Project Proportional Share: 12.7%<br />

Resulting LOS & Delay (sec): D/49.4<br />

Hwy 2 / Hayford: Convert the inside SB thru lane to a 2 nd SB left turn lane.<br />

Project Proportional Share: 9.3%<br />

Resulting LOS & Delay (sec): F/141.4<br />

Craig / SR 902: Install traffic signal or consider installation of a roundabout.<br />

Project Proportional Share: 17.4%<br />

Resulting LOS & Delay (sec): B/17.2 / B/10.7 (roundabout)<br />

Hwy 2 / Fairchild AFB: Modify signal timing. Add NB left turn lane and WB thru lane.<br />

Project Proportional Share: 6.9%<br />

Resulting LOS & Delay (sec): D/48.9<br />

Operational analysis results for all three alternatives for the improvements identified above are<br />

summarized in the ‘mitigation’ tables included at the end of this Executive Summary.<br />

General Re<strong>com</strong>mendations Applying to All Project Alternatives<br />

Roadway frontage improvements and driveway approaches including curb & gutter and sidewalks or<br />

shared use pathways should be constructed along the site frontages and should <strong>com</strong>ply with current<br />

West Plains Development – Spokane Tribe Page | 8<br />

<strong>Traffic</strong> <strong>Impact</strong> <strong>Analysis</strong> April 28, 2011