21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

HCM Signalized Intersection Capacity <strong>Analysis</strong><br />

10: SR-902 & Craig 2/8/2011<br />

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR<br />

Lane Configurations<br />

Volume (vph) 78 284 9 14 284 113 5 126 5 137 161 196<br />

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1000 1900 1900 1900 1900<br />

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0<br />

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00<br />

Frt 1.00 1.00 1.00 0.96 1.00 0.99 1.00 0.92<br />

Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00<br />

Satd. Flow (prot) 1787 1873 1805 1819 1770 974 1787 1726<br />

Flt Permitted 0.25 1.00 0.49 1.00 0.40 1.00 0.58 1.00<br />

Satd. Flow (perm) 474 1873 926 1819 743 974 1085 1726<br />

Peak-hour factor, PHF 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90<br />

Adj. Flow (vph) 87 316 10 16 316 126 6 140 6 152 179 218<br />

RTOR Reduction (vph) 0 2 0 0 23 0 0 3 0 0 72 0<br />

Lane Group Flow (vph) 87 324 0 16 419 0 6 143 0 152 325 0<br />

Heavy Vehicles (%) 1% 1% 1% 0% 0% 0% 2% 2% 2% 1% 1% 1%<br />

Turn Type pm+pt pm+pt pm+pt pm+pt<br />

Protected Phases 7 4 3 8 5 2 1 6<br />

Permitted Phases 4 8 2 6<br />

Actuated Green, G (s) 20.2 18.2 17.4 16.8 15.8 15.2 20.4 17.5<br />

Effective Green, g (s) 20.2 18.2 17.4 16.8 15.8 15.2 20.4 17.5<br />

Actuated g/C Ratio 0.38 0.34 0.33 0.32 0.30 0.29 0.39 0.33<br />

Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0<br />

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0<br />

Lane Grp Cap (vph) 231 644 315 578 234 280 457 571<br />

v/s Ratio Prot c0.01 0.17 0.00 c0.23 0.00 0.15 c0.02 c0.19<br />

v/s Ratio Perm 0.13 0.02 0.01 0.11<br />

v/c Ratio 0.38 0.50 0.05 0.73 0.03 0.51 0.33 0.57<br />

Uniform Delay, d1 11.5 13.8 12.1 16.0 13.2 15.7 11.0 14.6<br />

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00<br />

Incremental Delay, d2 1.0 0.6 0.1 4.5 0.0 1.6 0.4 1.3<br />

Delay (s) 12.5 14.4 12.1 20.5 13.2 17.3 11.5 15.9<br />

Level of Service B B B C B B B B<br />

Approach Delay (s) 14.0 20.2 17.2 14.7<br />

Approach LOS B C B B<br />

Intersection Summary<br />

HCM Average Control Delay 16.4 HCM Level of Service B<br />

HCM Volume to Capacity ratio 0.65<br />

Actuated Cycle Length (s) 52.9 Sum of lost time (s) 16.0<br />

Intersection Capacity Utilization 63.3% ICU Level of Service B<br />

<strong>Analysis</strong> Period (min) 15<br />

Description: Signalized, Optimized<br />

c Critical Lane Group<br />

2015 plus Project, Alt. 1, PH2-Mitigation Synchro 7 - Report<br />

cak Page 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!