21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

HCM Unsignalized Intersection Capacity <strong>Analysis</strong><br />

1: Hwy. 2 & Craig Road 2/14/2011<br />

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR<br />

Lane Configurations<br />

Volume (veh/h) 353 1854 223 109 1582 502 140 41 91 365 37 262<br />

Sign Control Free Free Stop Stop<br />

Grade 0% 0% 0% 0%<br />

Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93<br />

Hourly flow rate (vph) 380 1994 240 117 1701 540 151 44 98 392 40 282<br />

Pedestrians<br />

Lane Width (ft)<br />

Walking Speed (ft/s)<br />

Percent Blockage<br />

Right turn flare (veh)<br />

Median type TWLTL TWLTL<br />

Median storage veh) 2 2<br />

Upstream signal (ft)<br />

pX, platoon unblocked<br />

vC, conflicting volume 2241 2233 4139 5228 997 3811 4928 851<br />

vC1, stage 1 conf vol 2753 2753 1935 1935<br />

vC2, stage 2 conf vol 1387 2475 1876 2992<br />

vCu, unblocked vol 2241 2233 4139 5228 997 3811 4928 851<br />

tC, single (s) 4.1 4.1 7.5 6.5 6.9 7.5 6.5 6.9<br />

tC, 2 stage (s) 6.5 5.5 6.5 5.5<br />

tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3<br />

p0 queue free % 0 50 0 0 60 0 0 8<br />

cM capacity (veh/h) 231 232 0 0 244 0 0 306<br />

Direction, Lane # EB 1 EB 2 EB 3 EB 4 WB 1 WB 2 WB 3 WB 4 NB 1 SB 1<br />

Volume Total 380 997 997 240 117 851 851 540 292 714<br />

Volume Left 380 0 0 0 117 0 0 0 151 392<br />

Volume Right 0 0 0 240 0 0 0 540 98 282<br />

cSH 231 1700 1700 1700 232 1700 1700 1700 0 0<br />

Volume to Capacity 1.64 0.59 0.59 0.14 0.50 0.50 0.50 0.32 Err Err<br />

Queue Length 95th (ft) 611 0 0 0 65 0 0 0 Err Err<br />

Control Delay (s) 346.3 0.0 0.0 0.0 35.3 0.0 0.0 0.0 Err Err<br />

Lane LOS F E F F<br />

Approach Delay (s) 50.3 1.8 Err Err<br />

Approach LOS F F<br />

Intersection Summary<br />

Average Delay<br />

Err<br />

Intersection Capacity Utilization 122.0% ICU Level of Service H<br />

<strong>Analysis</strong> Period (min) 15<br />

West Plains Development <strong>Traffic</strong> <strong>Impact</strong> <strong>Analysis</strong> 5:00 pm 2/8/2011 2032 Alternative 3 Buildout<br />

Synchro 7 - Report<br />

Page 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!