21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

HCM Unsignalized Intersection Capacity <strong>Analysis</strong><br />

2: Hwy. 2 & Lundstrom St. 2/21/2011<br />

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR<br />

Lane Configurations<br />

Volume (veh/h) 46 2604 36 23 2463 40 0 0 48 0 0 53<br />

Sign Control Free Free Stop Stop<br />

Grade 0% 0% 0% 0%<br />

Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97<br />

Hourly flow rate (vph) 47 2685 37 24 2539 41 0 0 49 0 0 55<br />

Pedestrians<br />

Lane Width (ft)<br />

Walking Speed (ft/s)<br />

Percent Blockage<br />

Right turn flare (veh)<br />

Median type TWLTL TWLTL<br />

Median storage veh) 2 2<br />

Upstream signal (ft)<br />

pX, platoon unblocked<br />

vC, conflicting volume 2580 2722 4151 5407 1342 4073 5403 1270<br />

vC1, stage 1 conf vol 2779 2779 2587 2587<br />

vC2, stage 2 conf vol 1372 2628 1487 2816<br />

vCu, unblocked vol 2580 2722 4151 5407 1342 4073 5403 1270<br />

tC, single (s) 4.1 4.1 7.5 6.5 6.9 7.5 6.5 6.9<br />

tC, 2 stage (s) 6.5 5.5 6.5 5.5<br />

tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3<br />

p0 queue free % 72 84 100 100 66 100 100 66<br />

cM capacity (veh/h) 167 149 13 0 145 18 5 162<br />

Direction, Lane # EB 1 EB 2 EB 3 EB 4 WB 1 WB 2 WB 3 WB 4 NB 1 SB 1<br />

Volume Total 47 1342 1342 37 24 1270 1270 41 49 55<br />

Volume Left 47 0 0 0 24 0 0 0 0 0<br />

Volume Right 0 0 0 37 0 0 0 41 49 55<br />

cSH 167 1700 1700 1700 149 1700 1700 1700 145 162<br />

Volume to Capacity 0.28 0.79 0.79 0.02 0.16 0.75 0.75 0.02 0.34 0.34<br />

Queue Length 95th (ft) 28 0 0 0 14 0 0 0 35 35<br />

Control Delay (s) 35.0 0.0 0.0 0.0 33.7 0.0 0.0 0.0 42.3 38.1<br />

Lane LOS D D E E<br />

Approach Delay (s) 0.6 0.3 42.3 38.1<br />

Approach LOS E E<br />

Intersection Summary<br />

Average Delay 1.2<br />

Intersection Capacity Utilization 82.0% ICU Level of Service D<br />

<strong>Analysis</strong> Period (min) 15<br />

Description: Add NB&SB Right turn bays-2012, Add EB/WB right turn lanes, Eliminate NB/SB LT movements (2032)<br />

West Plains Development <strong>Traffic</strong> <strong>Impact</strong> <strong>Analysis</strong><br />

Synchro 7 - Report<br />

2032-Alternative 1 Buildout-Mitigated Page 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!