21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

HCM Unsignalized Intersection Capacity <strong>Analysis</strong><br />

1: Hwy. 2 & Craig Road 1/18/2011<br />

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR<br />

Lane Configurations<br />

Volume (veh/h) 36 1043 87 82 864 20 36 2 66 10 2 28<br />

Sign Control Free Free Stop Stop<br />

Grade 0% 0% 0% 0%<br />

Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93<br />

Hourly flow rate (vph) 39 1122 94 88 929 22 39 2 71 11 2 30<br />

Pedestrians<br />

Lane Width (ft)<br />

Walking Speed (ft/s)<br />

Percent Blockage<br />

Right turn flare (veh)<br />

Median type TWLTL TWLTL<br />

Median storage veh) 2 2<br />

Upstream signal (ft)<br />

pX, platoon unblocked<br />

vC, conflicting volume 951 1215 1871 2326 561 1826 2409 475<br />

vC1, stage 1 conf vol 1199 1199 1116 1116<br />

vC2, stage 2 conf vol 672 1127 710 1292<br />

vCu, unblocked vol 951 1215 1871 2326 561 1826 2409 475<br />

tC, single (s) 4.1 4.1 7.5 6.5 6.9 7.5 6.5 6.9<br />

tC, 2 stage (s) 6.5 5.5 6.5 5.5<br />

tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3<br />

p0 queue free % 95 85 75 99 85 93 98 94<br />

cM capacity (veh/h) 724 575 156 152 474 144 115 538<br />

Direction, Lane # EB 1 EB 2 EB 3 EB 4 WB 1 WB 2 WB 3 NB 1 SB 1<br />

Volume Total 39 561 561 94 88 619 331 112 43<br />

Volume Left 39 0 0 0 88 0 0 39 11<br />

Volume Right 0 0 0 94 0 0 22 71 30<br />

cSH 724 1700 1700 1700 575 1700 1700 271 288<br />

Volume to Capacity 0.05 0.33 0.33 0.06 0.15 0.36 0.19 0.41 0.15<br />

Queue Length 95th (ft) 4 0 0 0 13 0 0 48 13<br />

Control Delay (s) 10.2 0.0 0.0 0.0 12.4 0.0 0.0 27.3 19.7<br />

Lane LOS B B D C<br />

Approach Delay (s) 0.3 1.1 27.3 19.7<br />

Approach LOS D C<br />

Intersection Summary<br />

Average Delay 2.2<br />

Intersection Capacity Utilization 52.8% ICU Level of Service A<br />

<strong>Analysis</strong> Period (min) 15<br />

Existing PM Peak Hour Conditions<br />

Synchro 7 - Report<br />

cak Page 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!