21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Resulting LOS & Delay (sec): D/49.4<br />

Hwy 2 / Hayford: Convert the inside SB thru lane to a 2 nd SB left turn lane.<br />

Project Proportional Share: 9.3%<br />

Resulting LOS & Delay (sec): F/141.4<br />

Craig / SR 902: Install traffic signal or consider installation of a roundabout.<br />

Project Proportional Share: 17.4%<br />

Resulting LOS & Delay (sec): B/17.2 / B/10.7 (roundabout)<br />

Hwy 2 / Fairchild AFB: Modify signal timing. Add NB left turn lane and WB thru lane.<br />

Project Proportional Share: 6.9%<br />

Resulting LOS & Delay (sec): D /48.9<br />

Hwy 2 / Middle Driveway: Install traffic signal and approach improvements (SB Middle<br />

Driveway); install a WB right turn lane. Alternatively, consider installation of a roundabout.<br />

Project Proportional Share: 100%<br />

Resulting LOS & Delay (sec): D/40.3 / E/60.0 (roundabout)<br />

Regarding congestion at Hwy 2/Hayford, it is worth noting that development of an alternative east/west<br />

route through Airway Heights along the alignment of 21 st Ave. is under consideration by the City of<br />

Airway Heights, WSDOT Spokane County and the City of Spokane. The intent of this alternative route<br />

is to reduce through volumes on HWY 2 on the West Plains. Note, that at the time of publishing this<br />

report the 21 st Ave. project has not been officially adopted by the agencies involved or added to the<br />

regional transportation improvement plan list of projects. If the 21 st Ave. by-pass is accepted and<br />

adopted by the impacted agencies (WSDOT, City of Airway Heights, Spokane County and City of<br />

Spokane) the Spokane Tribe West Plains project could consider make a fair share contribution to the 21 st<br />

Ave. project in lieu of improvements at Hwy 2/Hayford.<br />

West Plains Development – Spokane Tribe Page | 86<br />

<strong>Traffic</strong> <strong>Impact</strong> <strong>Analysis</strong> April 28, 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!