21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

HCM Signalized Intersection Capacity <strong>Analysis</strong><br />

3: Hwy. 2 & Lawson St 2/8/2011<br />

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR<br />

Lane Configurations<br />

Volume (vph) 55 1661 35 87 1291 23 80 31 89 56 34 35<br />

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900<br />

Total Lost time (s) 5.0 5.0 5.0 5.0 4.0 4.0 4.0 4.0<br />

Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 1.00<br />

Frt 1.00 1.00 1.00 1.00 1.00 0.85 1.00 0.85<br />

Flt Protected 0.95 1.00 0.95 1.00 0.97 1.00 0.97 1.00<br />

Satd. Flow (prot) 1787 3563 1787 3565 1816 1599 1825 1599<br />

Flt Permitted 0.95 1.00 0.95 1.00 0.65 1.00 0.63 1.00<br />

Satd. Flow (perm) 1787 3563 1787 3565 1222 1599 1188 1599<br />

Peak-hour factor, PHF 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93<br />

Adj. Flow (vph) 59 1786 38 94 1388 25 86 33 96 60 37 38<br />

RTOR Reduction (vph) 0 1 0 0 1 0 0 0 49 0 0 24<br />

Lane Group Flow (vph) 59 1823 0 94 1412 0 0 119 47 0 97 14<br />

Heavy Vehicles (%) 1% 1% 1% 1% 1% 1% 1% 1% 1% 1% 1% 1%<br />

Turn Type Prot Prot Perm Perm Perm Perm<br />

Protected Phases 1 6 5 2 4 8<br />

Permitted Phases 4 4 8 8<br />

Actuated Green, G (s) 6.1 77.4 9.2 80.5 16.6 16.6 16.6 16.6<br />

Effective Green, g (s) 6.1 77.4 9.2 80.5 16.6 16.6 16.6 16.6<br />

Actuated g/C Ratio 0.05 0.66 0.08 0.69 0.14 0.14 0.14 0.14<br />

Clearance Time (s) 5.0 5.0 5.0 5.0 4.0 4.0 4.0 4.0<br />

Vehicle Extension (s) 3.0 3.8 3.0 2.5 3.0 3.0 3.0 3.0<br />

Lane Grp Cap (vph) 93 2353 140 2449 173 226 168 226<br />

v/s Ratio Prot 0.03 c0.51 0.05 c0.40<br />

v/s Ratio Perm c0.10 0.03 0.08 0.01<br />

v/c Ratio 0.63 0.77 0.67 0.58 0.69 0.21 0.58 0.06<br />

Uniform Delay, d1 54.5 13.8 52.5 9.5 47.8 44.5 47.0 43.6<br />

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00<br />

Incremental Delay, d2 13.3 1.7 12.0 0.3 10.8 0.5 4.7 0.1<br />

Delay (s) 67.8 15.6 64.5 9.8 58.7 44.9 51.8 43.7<br />

Level of Service E B E A E D D D<br />

Approach Delay (s) 17.2 13.2 52.5 49.5<br />

Approach LOS B B D D<br />

Intersection Summary<br />

HCM Average Control Delay 18.8 HCM Level of Service B<br />

HCM Volume to Capacity ratio 0.72<br />

Actuated Cycle Length (s) 117.2 Sum of lost time (s) 9.0<br />

Intersection Capacity Utilization 76.2% ICU Level of Service D<br />

<strong>Analysis</strong> Period (min) 15<br />

Description: Optimized<br />

c Critical Lane Group<br />

2012 plus Project, Alt. 2, Buildout Synchro 7 - Report<br />

cak Page 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!