MITIGATION-ALT 3, CONTINUED<br />

INTERSECTION<br />

2012 PM Peak<br />

BG + Alt3<br />

2032 PM Peak<br />

BG + Alt3<br />

Hwy. 2 /<br />

--<br />

LOS = E<br />

Fairchild AFB Delay = 71.4<br />

Optimized Signal Timing, Add NB Lt turn<br />

bay and WB through lane<br />

--<br />

LOS = D<br />

Delay = 48.9<br />

Hwy. 2 / CM = SBL CM = SBL<br />

Dwy. Middle LOS = F LOS = F<br />

Signalized<br />

Roundabout<br />

Delay = * Delay = *<br />

LOS = C<br />

LOS = D<br />

Delay = 29.3 Delay = 40.3<br />

LOS = A<br />

LOS = D<br />

Delay = 9.2 Delay = 60.0<br />

Listed below are improvements re<strong>com</strong>mended for consideration to reduce traffic impacts associated with<br />

the subject project. The project’s re<strong>com</strong>mended proportional share contribution for each mitigation is<br />

also listed. The proportional share for off-site intersections is calculated by divided the project generated<br />

traffic volume by the total intersection volume for each respective scenario.<br />

2012 (Alt. 3 Buildout) Mitigations:<br />

<br />

<br />

<br />

Hwy 2 / Craig: Install traffic signal and widen the NB and SB approaches to provide and<br />

exclusive left turn lane. Alternatively, consider installation of a roundabout.<br />

Project Proportional Share: 30.2%<br />

Resulting LOS & Delay (sec): C/28.2 / A/7.1 (roundabout)<br />

Hwy 2 / Hayford: Optimize signal timing and convert the inside SB thru lane to a 2 nd SB left<br />

turn lane.<br />

Project Proportional Share: 13.6%<br />

Resulting LOS & Delay (sec): D/40.6<br />

Craig / SR 902: Install traffic signal; alternatively, consider installation of a roundabout<br />

Project Proportional Share: 20.6%<br />

Resulting LOS & Delay (sec): B/15.1 / A/8.2<br />

Hwy 2 / Middle Driveway: Install traffic signal and approach improvements (SB Middle<br />

Driveway); install a WB right turn lane. Alternatively, consider installation of a roundabout.<br />

Project Proportional Share: 100%<br />

Resulting LOS & Delay (sec): C/29.3 / A/9.2 (roundabout)<br />

6.2 Bike, Pedestrian and Transit Facilities<br />

The traffic impacts of the project are not expected to have significant negative impact on non-motorized<br />

users. The addition of frontage improvements as discussed below will enhance bike and pedestrian<br />

facilities and ac<strong>com</strong>modation adjacent to the project site.<br />

It is re<strong>com</strong>mended that the project install pedestrian (sidewalks or trails) and bike lanes along Hwy 2 and<br />

Craig Rd. project site frontages according applicable requirements of WSDOT, City of Airway Heights<br />

and Spokane County and to <strong>com</strong>ply with local bike/pedestrian plans developed by the City of Airway<br />

Heights in the vicinity of the project.<br />

West Plains Development – Spokane Tribe Page | 74<br />

<strong>Traffic</strong> <strong>Impact</strong> <strong>Analysis</strong> April 28, 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!