21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

HCM Unsignalized Intersection Capacity <strong>Analysis</strong><br />

2: Hwy. 2 & Lundstrom St. 2/8/2011<br />

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR<br />

Lane Configurations<br />

Volume (veh/h) 27 1937 30 19 1727 31 15 3 21 12 4 17<br />

Sign Control Free Free Stop Stop<br />

Grade 0% 0% 0% 0%<br />

Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97<br />

Hourly flow rate (vph) 28 1997 31 20 1780 32 15 3 22 12 4 18<br />

Pedestrians<br />

Lane Width (ft)<br />

Walking Speed (ft/s)<br />

Percent Blockage<br />

Right turn flare (veh) 2<br />

Median type TWLTL None<br />

Median storage veh) 2<br />

Upstream signal (ft)<br />

pX, platoon unblocked<br />

vC, conflicting volume 1812 2028 3017 3920 1014 2891 3919 906<br />

vC1, stage 1 conf vol 2068 2068 1836 1836<br />

vC2, stage 2 conf vol 949 1852 1056 2084<br />

vCu, unblocked vol 1812 2028 3017 3920 1014 2891 3919 906<br />

tC, single (s) 4.1 4.1 7.5 6.5 6.9 7.5 6.5 6.9<br />

tC, 2 stage (s) 6.5 5.5 6.5 5.5<br />

tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3<br />

p0 queue free % 92 93 69 95 91 81 93 94<br />

cM capacity (veh/h) 335 280 49 59 240 66 56 283<br />

Direction, Lane # EB 1 EB 2 EB 3 WB 1 WB 2 WB 3 NB 1 SB 1<br />

Volume Total 28 1331 697 20 1187 625 40 34<br />

Volume Left 28 0 0 20 0 0 15 12<br />

Volume Right 0 0 31 0 0 32 22 18<br />

cSH 335 1700 1700 280 1700 1700 110 105<br />

Volume to Capacity 0.08 0.78 0.41 0.07 0.70 0.37 0.37 0.32<br />

Queue Length 95th (ft) 7 0 0 6 0 0 37 31<br />

Control Delay (s) 16.7 0.0 0.0 18.8 0.0 0.0 63.3 54.8<br />

Lane LOS C C F F<br />

Approach Delay (s) 0.2 0.2 63.3 54.8<br />

Approach LOS F F<br />

Intersection Summary<br />

Average Delay 1.3<br />

Intersection Capacity Utilization 71.2% ICU Level of Service C<br />

<strong>Analysis</strong> Period (min) 15<br />

2015 plus Project, Alt. 1, PH2-Mitigation Synchro 7 - Report<br />

cak Page 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!