HCM Signalized Intersection Capacity <strong>Analysis</strong><br />

3: Hwy. 2 & Lawson St 2/8/2011<br />

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR<br />

Lane Configurations<br />

Volume (vph) 61 1897 40 93 1494 30 86 34 94 65 35 42<br />

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900<br />

Total Lost time (s) 5.0 5.0 5.0 5.0 4.0 4.0 4.0 4.0<br />

Lane Util. Factor 1.00 0.95 1.00 0.95 1.00 1.00 1.00 1.00<br />

Frt 1.00 1.00 1.00 1.00 1.00 0.85 1.00 0.85<br />

Flt Protected 0.95 1.00 0.95 1.00 0.97 1.00 0.97 1.00<br />

Satd. Flow (prot) 1787 3563 1787 3564 1816 1599 1822 1599<br />

Flt Permitted 0.95 1.00 0.95 1.00 0.62 1.00 0.57 1.00<br />

Satd. Flow (perm) 1787 3563 1787 3564 1157 1599 1067 1599<br />

Peak-hour factor, PHF 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93<br />

Adj. Flow (vph) 66 2040 43 100 1606 32 92 37 101 70 38 45<br />

RTOR Reduction (vph) 0 1 0 0 1 0 0 0 47 0 0 25<br />

Lane Group Flow (vph) 66 2082 0 100 1637 0 0 129 54 0 108 20<br />

Heavy Vehicles (%) 1% 1% 1% 1% 1% 1% 1% 1% 1% 1% 1% 1%<br />

Turn Type Prot Prot Perm Perm Perm Perm<br />

Protected Phases 1 6 5 2 4 8<br />

Permitted Phases 4 4 8 8<br />

Actuated Green, G (s) 6.3 80.3 9.1 83.1 17.7 17.7 17.7 17.7<br />

Effective Green, g (s) 6.3 80.3 9.1 83.1 17.7 17.7 17.7 17.7<br />

Actuated g/C Ratio 0.05 0.66 0.08 0.69 0.15 0.15 0.15 0.15<br />

Clearance Time (s) 5.0 5.0 5.0 5.0 4.0 4.0 4.0 4.0<br />

Vehicle Extension (s) 3.0 3.8 3.0 2.5 3.0 3.0 3.0 3.0<br />

Lane Grp Cap (vph) 93 2363 134 2446 169 234 156 234<br />

v/s Ratio Prot 0.04 c0.58 0.06 c0.46<br />

v/s Ratio Perm c0.11 0.03 0.10 0.01<br />

v/c Ratio 0.71 0.88 0.75 0.67 0.76 0.23 0.69 0.09<br />

Uniform Delay, d1 56.5 16.5 54.9 11.0 49.7 45.7 49.1 44.7<br />

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00<br />

Incremental Delay, d2 21.9 4.3 20.0 0.6 18.3 0.5 12.5 0.2<br />

Delay (s) 78.4 20.9 74.9 11.7 68.0 46.2 61.6 44.9<br />

Level of Service E C E B E D E D<br />

Approach Delay (s) 22.6 15.3 58.4 56.7<br />

Approach LOS C B E E<br />

Intersection Summary<br />

HCM Average Control Delay 22.8 HCM Level of Service C<br />

HCM Volume to Capacity ratio 0.82<br />

Actuated Cycle Length (s) 121.1 Sum of lost time (s) 9.0<br />

Intersection Capacity Utilization 83.7% ICU Level of Service E<br />

<strong>Analysis</strong> Period (min) 15<br />

Description: Optimized<br />

c Critical Lane Group<br />

2015 plus Project, Alt. 1, PH2 Synchro 7 - Report<br />

cak Page 3