21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

HCM Unsignalized Intersection Capacity <strong>Analysis</strong><br />

10: SR-902 & Craig 2/14/2011<br />

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR<br />

Lane Configurations<br />

Volume (veh/h) 78 346 11 17 346 78 6 101 6 112 149 222<br />

Sign Control Free Free Stop Stop<br />

Grade 0% 0% 0% 0%<br />

Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90<br />

Hourly flow rate (vph) 87 384 12 19 384 87 7 112 7 124 166 247<br />

Pedestrians<br />

Lane Width (ft)<br />

Walking Speed (ft/s)<br />

Percent Blockage<br />

Right turn flare (veh)<br />

Median type None None<br />

Median storage veh)<br />

Upstream signal (ft)<br />

pX, platoon unblocked<br />

vC, conflicting volume 471 397 1316 1073 391 1086 1036 428<br />

vC1, stage 1 conf vol<br />

vC2, stage 2 conf vol<br />

vCu, unblocked vol 471 397 1316 1073 391 1086 1036 428<br />

tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2<br />

tC, 2 stage (s)<br />

tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3<br />

p0 queue free % 92 98 75 44 99 0 21 61<br />

cM capacity (veh/h) 1096 1173 27 200 658 100 211 629<br />

Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 SB 1<br />

Volume Total 87 397 19 471 126 537<br />

Volume Left 87 0 19 0 7 124<br />

Volume Right 0 12 0 87 7 247<br />

cSH 1096 1700 1173 1700 153 222<br />

Volume to Capacity 0.08 0.23 0.02 0.28 0.82 2.42<br />

Queue Length 95th (ft) 6 0 1 0 134 1099<br />

Control Delay (s) 8.6 0.0 8.1 0.0 89.3 687.9<br />

Lane LOS A A F F<br />

Approach Delay (s) 1.5 0.3 89.3 687.9<br />

Approach LOS F F<br />

Intersection Summary<br />

Average Delay 233.1<br />

Intersection Capacity Utilization 71.6% ICU Level of Service C<br />

<strong>Analysis</strong> Period (min) 15<br />

West Plains Development <strong>Traffic</strong> <strong>Impact</strong> <strong>Analysis</strong> 5:00 pm 2/8/2011 2032 Alternative 3 Buildout<br />

Synchro 7 - Report<br />

Page 10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!