Listed below are improvements re<strong>com</strong>mended for consideration to reduce traffic impacts associated with<br />

the subject project. The project’s re<strong>com</strong>mended proportional share contribution to each mitigation is also<br />

listed. The proportional share for off-site intersections is calculated by divided the project generated<br />

traffic volume by the total intersection volume for each respective scenario.<br />

2012 (Phase 1) Mitigations:<br />

<br />

<br />

<br />

Hwy 2 / Craig: Install traffic signal and widen the NB and SB approaches to provide and<br />

exclusive left turn lane. Alternatively, consider installation of a roundabout.<br />

Project Proportional Share: 34.2%<br />

Resulting LOS & Delay (sec): C/31.6 / A/7.8<br />

Hwy 2 / Hayford: Optimize signal timing and consider converting the inside SB thru lane to a<br />

2 nd SB left turn lane.<br />

Project Proportional Share: 15.8%<br />

Resulting LOS & Delay (sec): D/45.9<br />

Craig / SR 902: Install traffic signal or consider installation of a roundabout.<br />

Project Proportional Share: 23.7%<br />

Resulting LOS & Delay (sec): B/15.6 / A/8.6 (roundabout)<br />

Hwy 2 / Middle Driveway: Install traffic signal and approach improvements (SB Middle<br />

Driveway); install a WB right turn lane. Alternatively, consider installation of a roundabout.<br />

Project Proportional Share: 100%<br />

Resulting LOS & Delay (sec): A/9.8<br />

2015 (Phase 2) Mitigations:<br />

<br />

<br />

<br />

<br />

Hwy 2 / Craig: Install traffic signal and widen/improve intersection approaches to include dual<br />

EB, NB and SB left turn lanes and a 2 nd NB thru lane. Alternatively, consider installation of a<br />

roundabout.<br />

Project Proportional Share: 36.0%<br />

Resulting LOS & Delay (sec): D/44.7 / B/12.4<br />

Hwy 2 / Lundstrom: Restripe and widen approaches to ac<strong>com</strong>modate exclusive NB and SB right<br />

turn lanes.<br />

Project Proportional Share: 29.8%<br />

Resulting LOS & Delay (sec): F/63.3<br />

Hwy 2 / Hayford: Optimize signal timing and consider converting the inside SB thru land to a<br />

2 nd SB left turn lane. Restripe the wide paved median for a 2 nd WB left turn lane. Alternatively,<br />

widen the EB and NB approaches for exclusive right turn lanes along with adding the 2 nd WB<br />

left turn lane.<br />

Project Proportional Share: 17.7%<br />

Resulting LOS & Delay (sec): E/60.4 / D/54.0 (alternative)<br />

Craig / SR 902: Install traffic signal or consider installation of a roundabout.<br />

Project Proportional Share: 27.7%<br />

Resulting LOS & Delay (sec): B/16.4 / A/9.4 (roundabout)<br />

Hwy 2 / Middle Driveway: Install traffic signal and approach improvements (SB Middle<br />

Driveway); install a WB right turn lane. Alternatively, consider installation of a roundabout.<br />

Project Proportional Share: 100%<br />

Resulting LOS & Delay (sec): D/38.8 / B/18.6 (roundabout)<br />

West Plains Development – Spokane Tribe Page | 65<br />

<strong>Traffic</strong> <strong>Impact</strong> <strong>Analysis</strong> April 28, 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!