21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

HCM Unsignalized Intersection Capacity <strong>Analysis</strong><br />

2: Hwy. 2 & Lundstrom St. 2/9/2011<br />

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR<br />

Lane Configurations<br />

Volume (veh/h) 24 1574 30 19 1295 29 15 3 21 11 4 15<br />

Sign Control Free Free Stop Stop<br />

Grade 0% 0% 0% 0%<br />

Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97<br />

Hourly flow rate (vph) 25 1623 31 20 1335 30 15 3 22 11 4 15<br />

Pedestrians<br />

Lane Width (ft)<br />

Walking Speed (ft/s)<br />

Percent Blockage<br />

Right turn flare (veh)<br />

Median type TWLTL None<br />

Median storage veh) 2<br />

Upstream signal (ft)<br />

pX, platoon unblocked<br />

vC, conflicting volume 1365 1654 2412 3092 827 2273 3092 682<br />

vC1, stage 1 conf vol 1688 1688 1389 1389<br />

vC2, stage 2 conf vol 724 1404 884 1703<br />

vCu, unblocked vol 1365 1654 2412 3092 827 2273 3092 682<br />

tC, single (s) 4.1 4.1 7.5 6.5 6.9 7.5 6.5 6.9<br />

tC, 2 stage (s) 6.5 5.5 6.5 5.5<br />

tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3<br />

p0 queue free % 95 95 82 97 93 91 96 96<br />

cM capacity (veh/h) 499 391 88 105 319 122 100 397<br />

Direction, Lane # EB 1 EB 2 EB 3 WB 1 WB 2 WB 3 NB 1 SB 1<br />

Volume Total 25 1082 572 20 890 475 40 31<br />

Volume Left 25 0 0 20 0 0 15 11<br />

Volume Right 0 0 31 0 0 30 22 15<br />

cSH 499 1700 1700 391 1700 1700 148 178<br />

Volume to Capacity 0.05 0.64 0.34 0.05 0.52 0.28 0.27 0.17<br />

Queue Length 95th (ft) 4 0 0 4 0 0 26 15<br />

Control Delay (s) 12.6 0.0 0.0 14.7 0.0 0.0 38.3 29.4<br />

Lane LOS B B E D<br />

Approach Delay (s) 0.2 0.2 38.3 29.4<br />

Approach LOS E D<br />

Intersection Summary<br />

Average Delay 1.0<br />

Intersection Capacity Utilization 54.5% ICU Level of Service A<br />

<strong>Analysis</strong> Period (min) 15<br />

2012 plus Project, Alt. 3, Buildout Synchro 7 - Report<br />

cak Page 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!