21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

HCM Unsignalized Intersection Capacity <strong>Analysis</strong><br />

2: Hwy. 2 & Lundstrom St. 2/8/2011<br />

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR<br />

Lane Configurations<br />

Volume (veh/h) 27 1937 30 19 1727 31 15 3 21 12 4 17<br />

Sign Control Free Free Stop Stop<br />

Grade 0% 0% 0% 0%<br />

Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97<br />

Hourly flow rate (vph) 28 1997 31 20 1780 32 15 3 22 12 4 18<br />

Pedestrians<br />

Lane Width (ft)<br />

Walking Speed (ft/s)<br />

Percent Blockage<br />

Right turn flare (veh)<br />

Median type TWLTL None<br />

Median storage veh) 2<br />

Upstream signal (ft)<br />

pX, platoon unblocked<br />

vC, conflicting volume 1812 2028 3017 3920 1014 2913 3919 906<br />

vC1, stage 1 conf vol 2068 2068 1836 1836<br />

vC2, stage 2 conf vol 949 1852 1077 2084<br />

vCu, unblocked vol 1812 2028 3017 3920 1014 2913 3919 906<br />

tC, single (s) 4.1 4.1 7.5 6.5 6.9 7.5 6.5 6.9<br />

tC, 2 stage (s) 6.5 5.5 6.5 5.5<br />

tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3<br />

p0 queue free % 92 93 69 95 91 81 93 94<br />

cM capacity (veh/h) 335 280 49 59 240 65 56 283<br />

Direction, Lane # EB 1 EB 2 EB 3 WB 1 WB 2 WB 3 NB 1 SB 1<br />

Volume Total 28 1331 697 20 1187 625 40 34<br />

Volume Left 28 0 0 20 0 0 15 12<br />

Volume Right 0 0 31 0 0 32 22 18<br />

cSH 335 1700 1700 280 1700 1700 88 105<br />

Volume to Capacity 0.08 0.78 0.41 0.07 0.70 0.37 0.46 0.32<br />

Queue Length 95th (ft) 7 0 0 6 0 0 48 32<br />

Control Delay (s) 16.7 0.0 0.0 18.8 0.0 0.0 76.6 55.1<br />

Lane LOS C C F F<br />

Approach Delay (s) 0.2 0.2 76.6 55.1<br />

Approach LOS F F<br />

Intersection Summary<br />

Average Delay 1.5<br />

Intersection Capacity Utilization 64.5% ICU Level of Service C<br />

<strong>Analysis</strong> Period (min) 15<br />

2015 plus Project, Alt. 1, PH2 Synchro 7 - Report<br />

cak Page 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!