2032 Alternative 2 Mitigations:<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Hwy 2 / Craig: Install traffic signal and widen/improve intersection approaches to include<br />

dedicated NB and SB left turn lanes. Alternatively, consider installation of a roundabout.<br />

Project Proportional Share: 22.5%<br />

Resulting LOS & Delay (sec): F/109.7 / D/54.3 (roundabout)<br />

Hwy 2 / Lundstrom: Restripe and widen approaches to ac<strong>com</strong>modate exclusive NB and SB right<br />

turn lanes. Consider restricting NB/SB left turns and adding EB/WB right turn lanes.<br />

Project Proportional Share: 18.9%<br />

Resulting LOS & Delay (sec): D/34.1<br />

Hwy 2 / Lawson: Modify the signal timing. Add EB/WB right turn lanes, reconfigure N/S<br />

approaches.<br />

Project Proportional Share: 18.6%<br />

Resulting LOS & Delay (sec): D/37.4<br />

Hwy 2 / Garfield: Optimize signal timing. Add EB right turn lane, add separate NB left turn lane,<br />

reconfigure SB approach.<br />

Project Proportional Share: 14.8%<br />

Resulting LOS & Delay (sec): E/57.2<br />

Hwy 2 / Hayford: Convert the inside SB thru land to a 2 nd SB left turn lane and optimize signal<br />

timing.<br />

Project Proportional Share: 10.9%<br />

Resulting LOS & Delay (sec): F/147.0<br />

Craig / SR 902: Install traffic signal or consider installation of a roundabout.<br />

Project Proportional Share: 20.2%<br />

Resulting LOS & Delay (sec): B/18.2 / B/11.6<br />

Craig / Sixth Ave.: Widen the intersection approach to provide and exclusive NB right turn lane.<br />

Project Proportional Share: 25.6%<br />

Resulting LOS & Delay (sec): D/28.5<br />

Hwy 2 / Fairchild AFB: Modify signal timing. Add NB left turn lane and WB thru lane.<br />

Project Proportional Share: 8.2%<br />

Resulting LOS & Delay (sec): D/50.6<br />

Hwy 2 / Middle Driveway: Install traffic signal and approach improvements (SB Middle<br />

Driveway); install a WB right turn lane. Alternatively, consider installation of a roundabout.<br />

Project Proportional Share: 100%<br />

Resulting LOS & Delay (sec): D/46.8 / E/65.8 (roundabout)<br />

2032 Alternative 3 Mitigations:<br />

<br />

<br />

<br />

<br />

Hwy 2 / Craig: Install traffic signal and widen/improve intersection approaches to include<br />

dedicated NB and SB left turn lanes. Alternatively, consider installation of a roundabout.<br />

Project Proportional Share: 19.5%<br />

Resulting LOS & Delay (sec): F/90.3 / D/42.8 (roundabout)<br />

Hwy 2 / Lundstrom: Restripe and widen approaches to ac<strong>com</strong>modate exclusive NB and SB right<br />

turn lanes. Consider restricting NB/SB left turns and adding EB/WB right turn lanes.<br />

Project Proportional Share: 16.3%<br />

Resulting LOS & Delay (sec): D/32.4<br />

Hwy 2 / Lawson: Modify the signal timing. Reconfigure N/S approaches.<br />

Project Proportional Share: 16.0%<br />

Resulting LOS & Delay (sec): D/37.0<br />

Hwy 2 / Garfield: Optimize signal timing. Add EB right turn lane, add separate NB left turn lane,<br />

reconfigure SB approach.<br />

Project Proportional Share: 12.7%<br />

West Plains Development – Spokane Tribe Page | 85<br />

<strong>Traffic</strong> <strong>Impact</strong> <strong>Analysis</strong> April 28, 2011