21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

HCM Signalized Intersection Capacity <strong>Analysis</strong><br />

11: Hwy. 2 & Fairchild AFB 2/10/2011<br />

Movement EBT EBR WBL WBT NBL NBR<br />

Lane Configurations<br />

Volume (vph) 778 60 621 843 439 1243<br />

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900<br />

Total Lost time (s) 6.0 6.0 6.0 6.0 4.0 4.0<br />

Lane Util. Factor 0.95 1.00 0.97 0.95 0.97 1.00<br />

Frt 1.00 0.85 1.00 1.00 1.00 0.85<br />

Flt Protected 1.00 1.00 0.95 1.00 0.95 1.00<br />

Satd. Flow (prot) 3471 1553 3467 3574 3502 1615<br />

Flt Permitted 1.00 1.00 0.95 1.00 0.95 1.00<br />

Satd. Flow (perm) 3471 1553 3467 3574 3502 1615<br />

Peak-hour factor, PHF 0.72 0.72 0.72 0.72 0.72 0.72<br />

Adj. Flow (vph) 1081 83 862 1171 610 1726<br />

RTOR Reduction (vph) 0 47 0 0 0 0<br />

Lane Group Flow (vph) 1081 36 862 1171 610 1726<br />

Heavy Vehicles (%) 4% 4% 1% 1% 0% 0%<br />

Turn Type Perm Prot Free<br />

Protected Phases 6 5 2 4<br />

Permitted Phases 6 Free<br />

Actuated Green, G (s) 31.9 31.9 24.9 62.8 21.4 94.2<br />

Effective Green, g (s) 31.9 31.9 24.9 62.8 21.4 94.2<br />

Actuated g/C Ratio 0.34 0.34 0.26 0.67 0.23 1.00<br />

Clearance Time (s) 6.0 6.0 6.0 6.0 4.0<br />

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0<br />

Lane Grp Cap (vph) 1175 526 916 2383 796 1615<br />

v/s Ratio Prot 0.31 0.25 0.33 0.17<br />

v/s Ratio Perm 0.02 c1.07<br />

v/c Ratio 0.92 0.07 0.94 0.49 0.77 1.07<br />

Uniform Delay, d1 29.9 21.1 33.9 7.8 34.1 47.1<br />

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00<br />

Incremental Delay, d2 11.6 0.1 17.2 0.2 4.4 43.3<br />

Delay (s) 41.5 21.1 51.1 7.9 38.5 90.4<br />

Level of Service D C D A D F<br />

Approach Delay (s) 40.1 26.3 76.9<br />

Approach LOS D C E<br />

Intersection Summary<br />

HCM Average Control Delay 50.5 HCM Level of Service D<br />

HCM Volume to Capacity ratio 1.07<br />

Actuated Cycle Length (s) 94.2 Sum of lost time (s) 0.0<br />

Intersection Capacity Utilization 65.1% ICU Level of Service C<br />

<strong>Analysis</strong> Period (min) 15<br />

Description: Optimized<br />

Add NB Left turn bay and WB through lane<br />

c Critical Lane Group<br />

West Plains Development <strong>Traffic</strong> <strong>Impact</strong> <strong>Analysis</strong><br />

Synchro 7 - Report<br />

2032-Alternative 1 Buildout-Mitigated Page 7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!