21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

HCM Signalized Intersection Capacity <strong>Analysis</strong><br />

14: Hwy. 2 & Middle Access 2/8/2011<br />

Movement EBL EBT WBT WBR SBL SBR<br />

Lane Configurations<br />

Volume (vph) 318 1103 982 436 674 144<br />

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900<br />

Total Lost time (s) 5.0 5.0 4.0 4.0 4.0 4.0<br />

Lane Util. Factor 1.00 0.95 0.95 1.00 0.97 1.00<br />

Frt 1.00 1.00 1.00 0.85 1.00 0.85<br />

Flt Protected 0.95 1.00 1.00 1.00 0.95 1.00<br />

Satd. Flow (prot) 1770 3539 3539 1583 3433 1583<br />

Flt Permitted 0.95 1.00 1.00 1.00 0.95 1.00<br />

Satd. Flow (perm) 1770 3539 3539 1583 3433 1583<br />

Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92<br />

Adj. Flow (vph) 346 1199 1067 474 733 157<br />

RTOR Reduction (vph) 0 0 0 282 0 116<br />

Lane Group Flow (vph) 346 1199 1067 192 733 41<br />

Turn Type Prot Perm Perm<br />

Protected Phases 5 2 6 4<br />

Permitted Phases 6 4<br />

Actuated Green, G (s) 27.3 80.0 48.7 48.7 31.0 31.0<br />

Effective Green, g (s) 27.3 80.0 48.7 48.7 31.0 31.0<br />

Actuated g/C Ratio 0.23 0.67 0.41 0.41 0.26 0.26<br />

Clearance Time (s) 5.0 5.0 4.0 4.0 4.0 4.0<br />

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0<br />

Lane Grp Cap (vph) 403 2359 1436 642 887 409<br />

v/s Ratio Prot c0.20 0.34 c0.30 c0.21<br />

v/s Ratio Perm 0.12 0.03<br />

v/c Ratio 0.86 0.51 0.74 0.30 0.83 0.10<br />

Uniform Delay, d1 44.5 10.1 30.3 24.1 42.0 33.9<br />

Progression Factor 1.00 1.00 1.00 1.00 0.98 0.95<br />

Incremental Delay, d2 16.4 0.8 3.5 1.2 8.7 0.5<br />

Delay (s) 60.9 10.9 33.8 25.3 49.8 32.6<br />

Level of Service E B C C D C<br />

Approach Delay (s) 22.1 31.2 46.8<br />

Approach LOS C C D<br />

Intersection Summary<br />

HCM Average Control Delay 31.1 HCM Level of Service C<br />

HCM Volume to Capacity ratio 0.80<br />

Actuated Cycle Length (s) 120.0 Sum of lost time (s) 13.0<br />

Intersection Capacity Utilization 74.8% ICU Level of Service D<br />

<strong>Analysis</strong> Period (min) 15<br />

Description: Signalized, Optimized<br />

c Critical Lane Group<br />

2012 plus Project, Alt. 1, PH1-Mitigation Synchro 7 - Report<br />

cak Page 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!