21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

HCM Signalized Intersection Capacity <strong>Analysis</strong><br />

11: Hwy. 2 & Fairchild AFB 7/13/2011<br />

Movement EBT EBR WBL WBT NBL NBR<br />

Lane Configurations<br />

Volume (vph) 778 60 621 843 439 1243<br />

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900<br />

Total Lost time (s) 6.0 6.0 6.0 6.0 4.0 4.0<br />

Lane Util. Factor 0.95 1.00 0.97 1.00 1.00 0.88<br />

Frt 1.00 0.85 1.00 1.00 1.00 0.85<br />

Flt Protected 1.00 1.00 0.95 1.00 0.95 1.00<br />

Satd. Flow (prot) 3471 1553 3467 1881 1805 2842<br />

Flt Permitted 1.00 1.00 0.95 1.00 0.95 1.00<br />

Satd. Flow (perm) 3471 1553 3467 1881 1805 2842<br />

Peak-hour factor, PHF 0.72 0.72 0.72 0.72 0.72 0.72<br />

Adj. Flow (vph) 1081 83 862 1171 610 1726<br />

RTOR Reduction (vph) 0 41 0 0 0 0<br />

Lane Group Flow (vph) 1081 42 862 1171 610 1726<br />

Heavy Vehicles (%) 4% 4% 1% 1% 0% 0%<br />

Turn Type Perm Prot Free<br />

Protected Phases 6 5 2 4<br />

Permitted Phases 6 Free<br />

Actuated Green, G (s) 36.0 36.0 27.0 69.0 36.0 115.0<br />

Effective Green, g (s) 36.0 36.0 27.0 69.0 36.0 115.0<br />

Actuated g/C Ratio 0.31 0.31 0.23 0.60 0.31 1.00<br />

Clearance Time (s) 6.0 6.0 6.0 6.0 4.0<br />

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0<br />

Lane Grp Cap (vph) 1087 486 814 1129 565 2842<br />

v/s Ratio Prot 0.31 0.25 c0.62 c0.34<br />

v/s Ratio Perm 0.03 0.61<br />

v/c Ratio 0.99 0.09 1.06 1.04 1.08 0.61<br />

Uniform Delay, d1 39.4 27.9 44.0 23.0 39.5 0.0<br />

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00<br />

Incremental Delay, d2 25.8 0.1 48.3 36.9 61.2 1.0<br />

Delay (s) 65.2 28.0 92.3 59.9 100.7 1.0<br />

Level of Service E C F E F A<br />

Approach Delay (s) 62.5 73.7 27.0<br />

Approach LOS E E C<br />

Intersection Summary<br />

HCM Average Control Delay 51.6 HCM Level of Service D<br />

HCM Volume to Capacity ratio 1.05<br />

Actuated Cycle Length (s) 115.0 Sum of lost time (s) 10.0<br />

Intersection Capacity Utilization 77.0% ICU Level of Service D<br />

<strong>Analysis</strong> Period (min) 15<br />

Description: Add 2nd Nbound left turn lane, Optimize<br />

c Critical Lane Group<br />

West Plains Development <strong>Traffic</strong> <strong>Impact</strong> <strong>Analysis</strong> 2/9/2011 2032 Alternative 1 Mitigation<br />

Synchro 7 - Report<br />

Page 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!