21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

HCM Unsignalized Intersection Capacity <strong>Analysis</strong><br />

17: Middle Access & Craig Road 2/8/2011<br />

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR<br />

Lane Configurations<br />

Volume (veh/h) 46 0 63 0 0 0 69 707 0 0 559 49<br />

Sign Control Stop Stop Free Free<br />

Grade 0% 0% 0% 0%<br />

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92<br />

Hourly flow rate (vph) 50 0 68 0 0 0 75 768 0 0 608 53<br />

Pedestrians<br />

Lane Width (ft)<br />

Walking Speed (ft/s)<br />

Percent Blockage<br />

Right turn flare (veh)<br />

Median type TWLTL TWLTL<br />

Median storage veh) 2 2<br />

Upstream signal (ft)<br />

pX, platoon unblocked<br />

vC, conflicting volume 1553 1553 634 1621 1579 768 661 768<br />

vC1, stage 1 conf vol 634 634 918 918<br />

vC2, stage 2 conf vol 918 918 703 661<br />

vCu, unblocked vol 1553 1553 634 1621 1579 768 661 768<br />

tC, single (s) 7.1 6.5 6.2 7.1 6.5 6.2 4.1 4.1<br />

tC, 2 stage (s) 6.1 5.5 6.1 5.5<br />

tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2<br />

p0 queue free % 81 100 86 100 100 100 92 100<br />

cM capacity (veh/h) 257 276 479 214 259 401 927 846<br />

Direction, Lane # EB 1 EB 2 WB 1 NB 1 NB 2 SB 1<br />

Volume Total 50 68 0 75 768 661<br />

Volume Left 50 0 0 75 0 0<br />

Volume Right 0 68 0 0 0 53<br />

cSH 257 479 1700 927 1700 1700<br />

Volume to Capacity 0.19 0.14 0.00 0.08 0.45 0.39<br />

Queue Length 95th (ft) 18 12 0 7 0 0<br />

Control Delay (s) 22.3 13.8 0.0 9.2 0.0 0.0<br />

Lane LOS C B A A<br />

Approach Delay (s) 17.4 0.0 0.8 0.0<br />

Approach LOS C A<br />

Intersection Summary<br />

Average Delay 1.7<br />

Intersection Capacity Utilization 50.1% ICU Level of Service A<br />

<strong>Analysis</strong> Period (min) 15<br />

2019 plus Project, Alt. 1, PH3 Synchro 7 - Report<br />

cak Page 17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!