21.01.2015 Views

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

Appendix D Traffic Impact Analysis - westplainseis.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MOVEMENT SUMMARY<br />

Middle Dwy./Hwy. (YEAR 2019 PM PEAK, ALT.1,PH.3)<br />

West Plains Development<br />

Roundabout<br />

Site: Roundabout<br />

Movement Performance - Vehicles<br />

Mov ID Turn<br />

Demand<br />

Deg. Average Level of 95% Back of Queue Prop. Effective Average<br />

Flow HV Satn Delay Service Vehicles Distance Queued Stop Rate Speed<br />

veh/h % v/c sec veh ftper veh mph<br />

East: Hwy. 2<br />

6T T 2054 1.0 0.940 34.2 LOS C 24.5 618.2 1.00 1.16 17.0<br />

6R R 589 1.0 0.367 0.1 X X X X 0.33 32.1<br />

Approach 2643 1.0 0.940 26.6 LOS C 24.5 618.2 0.78 0.97 19.1<br />

North: Middle Dwy.<br />

7L L 736 1.0 1.405 239.9 LOS F 49.9 1258.1 1.00 2.74 5.1<br />

4R R 226 1.0 0.141 0.0 X X X X 0.33 32.1<br />

Approach 962 1.0 1.405 183.6 LOS F 49.9 1258.1 0.77 2.18 6.2<br />

West: Hwy. 2<br />

5L L 304 1.0 0.448 11.8 LOS B 2.4 59.3 0.65 0.90 23.0<br />

2T T 1774 1.0 0.920 33.5 LOS C 14.5 366.0 1.00 1.26 17.9<br />

Approach 2078 1.0 0.920 30.4 LOS C 14.5 366.0 0.95 1.21 18.6<br />

All Vehicles 5683 1.0 1.405 54.6 LOS D 49.9 1258.1 0.84 1.26 13.6<br />

X: Not applicable for Continuous movement.<br />

Level of Service (LOS) Method: Delay (HCM 2000).<br />

Roundabout LOS Method: Same as Signalised Intersections.<br />

Vehicle movement LOS values are based on average delay per movement<br />

Intersection and Approach LOS values are based on average delay for all vehicle movements.<br />

Roundabout Capacity Model: SIDRA Standard.<br />

HCM Delay Model used.<br />

Processed: Wednesday, July 13, 2011 10:52:36 AM Copyright © 2000-2011 Akcelik and Associates Pty Ltd<br />

SIDRA INTERSECTION 5.1.3.1990<br />

www.sidrasolutions.<strong>com</strong><br />

Project: P:\S\SPTR00000001\0600INFO\<strong>Traffic</strong>\April 2011-Final TIA\Sidra\7-12-11\Hwy.2-Middle Dwy\Alt1-<br />

PH3.sip<br />

8000011, DAVID EVANS & ASSOCIATES INC, SINGLE

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!