23.07.2013 Views

MOSAIQ User's Guide - UCSF Radiation Oncology

MOSAIQ User's Guide - UCSF Radiation Oncology

MOSAIQ User's Guide - UCSF Radiation Oncology

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>MOSAIQ</strong> User’s <strong>Guide</strong><br />

Changing the Due Date of One Treatment Session<br />

You can also change the due date of one treatment session so that it does not change or move<br />

the due dates of other treatment sessions. For example, you can reschedule a missed<br />

treatment to a Saturday, which would not change the due dates for other treatment sessions.<br />

1. In the Treatment Calendar window, click the treatment session, then click Change to<br />

open the Treatment Calendar Session dialog box.<br />

You can create treatment sessions and schedule or change treatment fields and portal<br />

imaging within sessions. You can also schedule QA Mode sessions to check field<br />

accuracy before or during a course of therapy, create notes for the session(s), and change<br />

the approval status of a treatment field.<br />

2. Type the new due date for the treatment session in the Due field.<br />

3. In the Due Date Shift group, click No other sessions if it is not already selected.<br />

4. Click OK to change the due date of the treatment session.<br />

Moving a Treatment Session to the End of the Treatment Calendar<br />

You can move a treatment session to the end of the patient Treatment Calendar. This is<br />

almost the same as the Add to End feature in the Wave Edit Form.<br />

A treatment session can have more than one prescription, such as a<br />

primary followed by a boost or cone down. If you move this treatment<br />

session for the primary to the end, it moves to the end of the<br />

treatment sessions. It does not move to the end of the primary’s<br />

treatment sessions.<br />

1. In the Treatment Calendar window, click the treatment session to move to the end.<br />

2. Click Change to open the Treatment Calendar Session dialog box.<br />

3. In the Due Date Shift group, click Move this session to the end.<br />

4. Click OK to move the treatment session.<br />

The Treatment Calendar automatically schedules around weekends if you move the date<br />

to the end of the treatment sessions. If your System Administrator schedules your<br />

holidays in <strong>MOSAIQ</strong>, the Treatment Calendar also automatically schedules around<br />

them.<br />

118 Copyright 2010, Elekta Impac Software<br />

LUGMSQ0002/4.0/23-Sep-2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!